J630D
26.7.02
7
0.2
Measures to be taken in the event of damage incurred during
transit
Any damage to the exterior or losses must be recorded in the appropriate manner
on the freight note before the machine/system is accepted and reported immedi-
ately to the insurer and K.Jung GmbH.
In the event of damage that has occurred not being detected until the machine/
system is unpacked, leave the machine/system as you found it and notify the car-
rier in writing that confirmation of the damage incurred is required. Complaints in
this case must be made within 6 days of receiving the consignment.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......