![Julabo Magio MX Original Operating Manual Download Page 45](http://html1.mh-extra.com/html/julabo/magio-mx/magio-mx_original-operating-manual_2030737045.webp)
Initial operation
45
4. Mount the barbed fittings with the union nuts on the pump connections.
5. Carefully tighten the union nuts with a maximum of 3 Nm torque.
6. Attach the hoses of the external system on the barbed fittings.
Pay attention to the supply and runback position.
7. Secure the hose against slippage using tube clamps.
Check the hoses for secure and leak-proof fit.
The external system is connected.
If the external system is disassembled, the pump connections must be
resealed with the sealing plugs so that no bath fluid can splash out during
operation.
7.4 Switch on the device and set the language
The language must be set first, to prepare for important basic settings. When
switching on for the first time, alarm messages may be shown on the display.
The device is connected and ready for operation.
1. Switch the device on at the mains switch.
The software boots and starts the device. The display shows the device
name, voltage version and software version.
Since no temperature liquid has been filled yet, the low level alarm is
displayed.
Depending on the default setting, the high temperature cut-off alarm is
displayed.
2. Call up the
<Main menu>
.
3. Call up the submenu
<Settings>
then menu option
<Language>
.
The submenu
<Language>
lists all the languages installed on the device.
4. Select the desired language.
5. Turn the device off so that the alarm message is reset.
The language is set.
Summary of Contents for Magio MX
Page 100: ......