![Julabo Magio MX Original Operating Manual Download Page 39](http://html1.mh-extra.com/html/julabo/magio-mx/magio-mx_original-operating-manual_2030737039.webp)
Initial operation
39
7 Initial operation
Commissioning is carried out in various steps, depending on how the device is
to be used.
7.1 Mounting the circulator
Bridge Mounted Circulator
7.1.1 Mount bridge mounted circulator
With the extendable telescopic bridge, the circulator can be mounted on open
bath tanks with a width of 33 cm to 68 cm.
Cross-headed screwdriver, size 2
The circulator is equipped with the telescopic bridge.
The bath is empty.
1. Dismount the two screws on the sides of the telescopic bridge.
2. Extend the telescopic bridge.
3. Carefully insert the circulator into the bath.
4. Push the telescopic bridge together until the side angle plates rest against
the edge of the bath.
The thermostat is mounted on the open bath as a bridge mounted
circulator.
Summary of Contents for Magio MX
Page 100: ......