![JUKI PLC-2760NVM Instruction Manual Download Page 20](http://html1.mh-extra.com/html/juki/plc-2760nvm/plc-2760nvm_instruction-manual_2029497020.webp)
– 18 –
13-2.
Top feed cam timing
1) Set the stitch length to "6.0" on the stitch length
screen.
*
The PLC-2710V-7 and the PLC-2760V-7 have
different displays.
2) Set the amount of the alternating vertical
movement of the walking foot and presser foot
to "3.0" on the alternating vertical movement
amount screen.
*
The PLC-2710V-7 and the PLC-2760V-7 have
different displays.
WARNING :
To protect against possible personal injury due to abrupt startup of the sewing machine, be sure to
press the standby switch and confirm that the screen has changed over to the standby mode screen
before starting work.