Installation and operating instructions: JUDO JRSF automatic backwashing protection filter JRSF-ATP DN 125 - 200 (time and differential pressure controlled)
All rights reserved.
JUDO Wasseraufbereitung GmbH
© JUDO Wasseraufbereitung GmbH
Postfach 380
D-71351 Winnenden
Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special
approval.
Tel. +49 (0)7195-692-0
Fax +49 (0)7195-692-188
Revision level: 24.05.2017
E-mail: [email protected]
judo.eu
37
Key
or
is used to navigate between the settings for hours and minutes, here the respective
selected item flashes.
Press the
+
or
–
key to program the current time.
If necessary press key
2x, the date display format starts to flash.
Use key
+
or
–
to select the desired display format.
Then press
OK
to save the settings, the sub-menu is output to the display again.
Pressing the
ESC
key displays the main menu of the expert level.
Press
ESC
again to return to the status display.
6
Commissioning
Attention
Prerequisite for commissioning is the correct installation of the JUDO fault indicator
JRSF automatic backwashing protection filter plus all device components!
The setting of the control unit must be matched to the respective circumstances and
local requirements (observe Chap. 5.4 - 5.5)!
The commissioning must only be performed by JUDO customer service or authorised
technical personnel!
The transfer confirmation (see Chap. 7.5) must be carefully filled out upon
commissioning!
Observe the separate installation and operating instructions of other devices and
systems!
6.1
Initial commissioning
During initial commissioning, it must be ensured that
-
no visible damage to JUDO JRSF automatic backwashing protection filter or its device components
exists,
-
all hydraulic and pneumatic connections are checked for leak-tightness,
-
the drainage system is ready,
-
the electrical connections are correctly made.