background image

About these operating instructions

JUDO QUICKSOFT MEGA 4

5

1

About these operating in-

structions

These operating instructions must always
be available at the place of use of the water
softening system.
These operating instructions should simplify
getting to know your water softening system
and inform you of its intended applications.
The operating instructions contain important
information pertaining to safe, proper and ef-
ficient operation of the water softening sys-
tem. They contain basic information that
must be observed during installation, opera-
tion and servicing. Observance of this infor-
mation will help to avoid dangers, reduce re-
pair costs and increase the reliability and
service life of the water softening system.
The operating instructions must be read by
each person charged with working on the
water softening system, e.g. for:

– Installation
– Operation
– Servicing 

(maintenance, inspection, servicing)

Installation and servicing must only be per-
formed by personnel who have been author-
ised by the manufacturer to do so, i.e. who
are able to fulfil the instructions referred to in
the installation and operating instructions as
well as country-specific regulations.
Alongside the operating instructions and the
legal regulations applicable in the country
and place of use in respect of accident pre-
vention, the recognised technical regula-
tions for safe and professional work must be
observed.
Therefore, these operating instructions must
be read by the installer and the responsible
technical personnel/operators prior to instal-
lation, commissioning and servicing.

Not only must the general safety instruc-
tions listed in chapter “Intended use” be
observed, but also the specific safety in-
structions that are included under the
other main points.

1.1

Symbols used

The safety instructions contained in these
operating instructions are labelled with the
following symbols:

Instructions attached directly to the rotary
flange fitting or the water softening system,
such as:
– Direction of flow
– Type label
– Cleaning information 
must be observed without fail and main-
tained so that they are always legible.

NOTICE

Indication of 
existing dan-
gers

Warning of electric voltage

Torques specified by the manu-
facturer

User tips and other information

Summary of Contents for 8200367

Page 1: ...Read before use and store Installation and operating instructions JUDO QUICKSOFT MEGA 4 Water softening unit Valid for EU countries and Switzerland Language English...

Page 2: ...nfidence you have shown in us by purchasing this device In purchasing this water softening system you have procured a state of the art de vice This device is suitable for use in cold drinking water up...

Page 3: ...JUDO QUICKSOFT MEGA 4 3...

Page 4: ...5 Menu structure 18 5 6 Function description 19 5 7 Filling with salt 20 5 8 Potential free fault indication 21 5 9 Integration of the water softening system in building control systems 21 5 10 Connec...

Page 5: ...to do so i e who are able to fulfil the instructions referred to in the installation and operating instructions as well as country specific regulations Alongside the operating instructions and the le...

Page 6: ...softened must comply with the European Drinking Water Direc tive The manufacturer supplier must be consult ed before using water of a different quality or water with additional additives The water so...

Page 7: ...em is not regularly serviced the softening function can be im paired NOTICE see chapter 1 2 Safety instructions and dangers due to non observation Where the water pressure is greater than 7 bar a pres...

Page 8: ...and cleaning agents reduced 3 2 Materials used The materials used are resistant to the phys ical chemical and corrosive loads expected to be encountered in drinking water and fulfil the specification...

Page 9: ...annot be safely and completely drained it is possible that property damage to the home and fur nishings may be caused by the water A shut off valve must be installed up stream and downstream of the wa...

Page 10: ...ed by an arrow integral with the casting see fig 2 The flange surface of the rotary flange fitting must be upright The rotary flange fitting must be fitted so that it is free from mechan ical stress o...

Page 11: ...is can result in water damage to the building furnishings and equipment Raise the water softening system and swivel approximately 30 in counter clockwise direction Place it on the parallel connection...

Page 12: ...r next to it on the floor Fig 6 Connection of the water softening system with the salt reservoir 1 2 Marking arrow unlocked Marking arrow locked Lance Salt reservoir Note the marking arrow In doing so...

Page 13: ...outside diameter must not be routed any higher than the control head The hose length must not exceed 3 m The safety overflow hose with 19 mm out side diameter must be routed with a steady downward slo...

Page 14: ...nu individual values are in creased or decreased using keys and and then accepted using the OK key Sub menus Raw water hardness Raw water hardness setting see chapter 5 4 3 Raw water hardness set ting...

Page 15: ...or coarse grains 7 15 mm If other regenerating salts are used then the salt reservoir must be cleaned at shorter intervals and the intake strainer replaced more frequently Remove the cover Enter the...

Page 16: ...s treated If the raw water hardness is low a greater water volume is treated The water softening system is pre set to a raw water hardness of 25 e Another raw water hardness is set as follows Press ke...

Page 17: ...es are much higher partially greater than 1000 mg sodium per litre If the calculated total sodium content ex ceeds the valve permitted by the drinking water legislation of 200 mg l then it can be corr...

Page 18: ...Operation 18 JUDO QUICKSOFT MEGA 4 5 5 Menu structure Fig 12 Menu structure...

Page 19: ...way soft water is always available for the consumer even during regeneration 5 6 3 Regeneration With a very short regeneration period of about 7 5 minutes per resin container total 15 minutes high vol...

Page 20: ...brine concentration is too low the display in dicates After this message replenishment with a quantity of 25 kg of regenerating salt is re quired Then the OK key must be briefly pressed The warning m...

Page 21: ...tegration of the water soften ing system in building control systems The water softening system can be integrat ed via the potential free relay into a building control system e g EIB LCN or LON For ex...

Page 22: ...closed or the bypass valve is switched over When disassembled the water softening system must be stored in a dry and frost free location The connection flange must be protect ed against dirt and dama...

Page 23: ...eration Maintenance Service req Message appears after the one year maintenance interval has elapsed see chapter 8 3 1 Message Mainte nance Service Attention Salt deficit Message appears after exceedin...

Page 24: ...opriate hygiene measures Thus for example the salt packs should be cleaned before use so that no impurities can get into the salt dissolving container The re generating salt must be shaken into the sa...

Page 25: ...ing sys tem Operating pres sure Rated pressure 2 7 bar PN 10 Pipe connection 1 Number of single softeners 2 Recommended number of dwelling units 3 6 Operating weight with full salt charge approx 180 k...

Page 26: ...mixing water pipe downstream of the water softening system so that the water can be admixed proportionally with a JUL mineral solution The JUL mineral solutions contain sub stance components that stab...

Page 27: ...Data sheet JUDO QUICKSOFT MEGA 4 27 Fig 14 Electronic control unit with fault message relay...

Page 28: ...Spare parts 28 JUDO QUICKSOFT MEGA 4 10 Spare parts Fig 15 Spare parts JUDO QUICKSOFT MEGA 4 1 A 2 4 3 B 5 6 7 8 8 9 9 10 11...

Page 29: ...essure regulator 2200582 88 Spare part set injector 2201470 78 A Spare part set hoses complete 2200012 25 B Spare part set overflow connection 2202230 38 1 Power supply unit EU 24 V DC 2210506 65 2 La...

Page 30: ...30 JUDO QUICKSOFT MEGA 4 Notes...

Page 31: ...JUDO QUICKSOFT MEGA 4 31 Notes...

Page 32: ...eraufbereitung GmbH Filiaal Filiale BeNeLux Laarbeeklaan Av du Laerbeek 72 A1 B 1090 Brussel Bruxelles Tel T l 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu judo eu JUDO France S r...

Reviews: