JPE CRYO STAGE 02 User Manual Download Page 1

 

 

 

 

 

Page 1 / 11 

 

JPE 

 

 

  +31 (0) 43 3585 777 

Property of: JPE 

Last update: 2021-07-08 

  www.jpe.nl 

Author: JPE 

Revision: 03 

  Aziëlaan 12 

Filename: CNP_MAN01-04_R03_CS02.docx 

Doc status: Released 

 

6199 AG Maastricht-Airport 

 

 

 

The Netherlands 

 

 

 

 

MAN01-04

 

 

C

RYO 

S

TAGE 

02

 

(CS02)

 

U

SER 

M

ANUAL

 

CRYO & NANO PRODUCTS 

 

 
 

 

 

Summary of Contents for CRYO STAGE 02

Page 1: ...ty of JPE Last update 2021 07 08 www jpe nl Author JPE Revision 03 Azi laan 12 Filename CNP_MAN01 04_R03_CS02 docx Doc status Released 6199 AG Maastricht Airport The Netherlands MAN01 04 CRYO STAGE 02...

Page 2: ...ision 03 Filename CNP_MAN01 04_R03_CS02 docx Doc status Released CONTENTS 1 INTRODUCTION 4 1 1 Prerequisites 4 2 INSIDE THE BOX 5 3 MOUNTING INSTRUCTIONS 6 4 CONNECTING TO THE CONTROLLER 7 4 1 Drive S...

Page 3: ...NTATION Ref Title Author 1 CNP_MAN00_Rxx_Getting Started pdf JPE 2 CNP_MAN02_Rxx_Software User Manual pdf JPE 3 CNP_APN01_Rxx_Connection Overview pdf JPE 4 CS02_Interface drawings pdf JPE 5 CS02_Broch...

Page 4: ...l not be liable for damage or injury resulting from misuse of the controller s positioner s actuator s and or stage s or unauthorized alterations to either of those All products mentioned in this manu...

Page 5: ...d membrane polypropylene box one stage per box The stage is fixed onto the inner part of the polypropylene using fasteners The inner part can be taken out and bend in such way that the stage can be ea...

Page 6: ...interfaces Make sure the wiring to the Connector Interface PCB and or Sensor product type option RLS does not get damaged or stuck in the setup when mounting the stage in the customer setup All connec...

Page 7: ...CB The Ambient Cable ACL or Cryostat Cable CCL can be connected directly to the Connector Interface PCB If any custom cabling is required please consult the Getting Started Guide MAN00 or the Connecti...

Page 8: ...view application note APN01 Figure 4 FPC for 3 axis connected to CCR right Figure 5 RLS X Y Z axis reference PFC top view Pin configuration for each axis Pin Name RLS PCB Reference 1 Wiper Negative A...

Page 9: ...ucts Page 9 11 Property of JPE Last update 2021 07 08 Author JPE Revision 03 Filename CNP_MAN01 04_R03_CS02 docx Doc status Released CS02 RLS X RSM Input A 4 CS02 RLS Y RSM Input B CS02 RLS Z RSM Inpu...

Page 10: ...imum stroke the sensor can measure as well as the center nominal position Calibration is done in cooperation with the Resistive Sensor Module RSM This means that the calibration settings for a specifi...

Page 11: ...The Netherlands The manufacturer hereby declares that the product Product Name Cryo Stage 02 CS02 Product Description Orthogonal xyz positioning with high load capacity fitting a 50mm bore Product Nu...

Reviews: