
78
3.4.3.2. Installation of IN and EX
3.4.3.2.1. Assembling of valve springs
Attention
It is for you to distinguish the
different suppliers by means of paintings on
the valve spring, valve spring of same
engine should have the same identification
paint marking.
3.4.3.3.
Install the locking blocks for the
valve spring stands.
Warning
·Protective eye glasses must be worn in the
process of this operation to protect the eyes.
·Beware of the flying spring and other
objects
Upon completion of the installation of the
throttle springs and throttle spring stands,
use special tools to install the locking blocks
for the throttle spring stands.
3.4.3.4. Installation of the throttle thrusting
rod and throttle spacing by adjusting
the separation cushions
3.4.3.5.
Install the cylinder cover base, make
identification of the marks for the
front and rear directions.
3.4.4. Assembling of dustproof sealing strip and
cylinder cover
3.4.4.1. Apply lubricating oil at the threads and
grooves of the bolts.
3.4.4.2. The tightening of the cylinder bolts
should follow the sequence as shown in
the right figure. The tightening is to be
carried out in 2—3 operations till the
torque meets the specifications. The
torque for the first tightening operation is
30±2N.m; the torque for the second
tightening operation is 50±3N.m; and the
Summary of Contents for TROOPER T2
Page 6: ...6 Warranty policy...
Page 7: ...7...
Page 8: ...8...
Page 9: ...9...
Page 10: ...10 Parts order form warranty claim form...
Page 11: ...11 Service record form...
Page 12: ...12 Preventative maintenance and service log...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 18: ...18...
Page 19: ...19...
Page 20: ...20...
Page 55: ...55 Repair manual Chassis wiring diagram...
Page 99: ...99 Electric injection system...
Page 100: ...100...
Page 101: ...101...
Page 102: ...102...
Page 103: ...103...
Page 104: ...104...
Page 105: ...105...
Page 106: ...106...
Page 107: ...107...
Page 108: ...108...
Page 109: ...109...
Page 110: ...110...
Page 111: ...111...
Page 112: ...112...
Page 113: ...113...
Page 114: ...114...
Page 115: ...115...
Page 116: ...116...
Page 117: ...117...
Page 118: ...118...
Page 119: ...119...
Page 120: ...120...
Page 121: ...121...
Page 122: ...122...
Page 123: ...123...
Page 124: ...124...
Page 125: ...125...
Page 126: ...126...
Page 127: ...127...
Page 128: ...128...
Page 129: ...129...
Page 130: ...130...
Page 131: ...131...
Page 132: ...132...
Page 133: ...133...
Page 134: ...134...
Page 135: ...135...
Page 136: ...136...
Page 137: ...137...
Page 138: ...138...
Page 169: ...169 CHASSIS...
Page 170: ...170...
Page 171: ...171...
Page 172: ...172...
Page 173: ...173...
Page 174: ...174...
Page 175: ...175...
Page 176: ...176...
Page 177: ...177...
Page 178: ...178...
Page 179: ...179...
Page 180: ...180...
Page 181: ...181...
Page 182: ...182...
Page 183: ...183...
Page 184: ...184...
Page 185: ...185...
Page 186: ...186...
Page 187: ...187...
Page 188: ...188...
Page 189: ...189...
Page 190: ...190...
Page 191: ...191...
Page 192: ...192...
Page 193: ...193...
Page 194: ...194...
Page 195: ...195...
Page 196: ...196...
Page 197: ...197...
Page 198: ...198...
Page 202: ...202 DEALER PRE DELIVERY INSPECTION...