![Johnson J10RLSUR Service Manual Download Page 192](http://html1.mh-extra.com/html/johnson/j10rlsur/j10rlsur_service-manual_2022850192.webp)
190
MANUAL STARTER
INSTALLATION
INSTALLATION
Position starter on engine. Connect starter lockout
link to cam. Turn cam screw IN carefully until
screw head contacts cam. Do not overtighten.
Install starter screws. Tighten screws 60 to 84 in.
lbs. (7 to 9 N·m).
Check operation of starter and starter lockout.
Starter should crank outboard in NEUTRAL gear.
Starter MUST NOT crank outboard in FOR-
WARD or REVERSE gear.
1.
Lockout link
33746
1
1.
Starter screws
32312
1
1
Summary of Contents for J10RLSUR
Page 1: ......
Page 2: ......
Page 147: ...POWERHEAD POWERHEAD VIEWS 145 7 POWERHEAD VIEWS Port Starboard View Manual Start DP0019 DP0020...
Page 148: ...146 POWERHEAD POWERHEAD VIEWS Rear View Manual Start DP0021...
Page 194: ...S 2...
Page 223: ...DR4698 Water Flow Diagram 9 9 15HP...
Page 228: ...A B C D E B C D E A 9 9 15HP DRC 6217 2 1...
Page 229: ......