Associated literature
Table 1: List of associated literature
Manual description
Form number
Installation checklist and start-up request
Unit start-up checklist
Installation and reassembly - unit
Installation - MV VSD - 2300 VAC – 6600 VAC
Installation - MV VSD - 10 kV – 13.8 kV
Wiring Diagrams - field connections - unit-mounted SSS, MV SSS, or remote mounted MV SSS, MV EMS
Wiring diagrams - field connections - remote mounted MV SSS
Wiring diagrams - field connections - remote mounted MV VSD
Wiring diagrams - field connections - LV VSD
Wiring diagrams - OptiView Control Center and EMS
Wiring diagrams - OptiView Control Center and EMS with the LTC I/O Board
Wiring diagrams - OptiView Control Center and SSS, LV VSD, MV VSD
Wiring diagrams - OptiView Control Center and SSS, LV VSD, MV VSD with the LTC I/O board
Wiring diagrams - field control modifications
Unit operation and maintenance
Operation OptiView panel
Operation - variable speed drive - TM model
Operation and maintenance - solid state starter (Mod "B")
Operation - variable speed drive - VSD and LVD model
Operation - variable speed drive - HYP model
Operation - floor mounted MV SSS, manufactured before 2007
Operation - floor mounted MV SSS, manufactured after 2007
Operation - unit mounted MV SSS
Operation - MV VSD - 2300 VAC – 6600 VAC
Operation - MV VSD - 10 kV – 13.8 kV
Service policy - shipping damage claims
Nomenclature
7
Model YK (Style G) Centrifugal Liquid Chiller
Summary of Contents for YORK YK Series
Page 2: ...2 Model YK Style G Centrifugal Liquid Chiller...
Page 14: ...Figure 3 Long term storage tube side Model YK Style G Centrifugal Liquid Chiller 14...
Page 19: ...Figure 6 Neoprene isolators in mm 19 Model YK Style G Centrifugal Liquid Chiller...
Page 20: ...Figure 7 Spring isolators in mm Model YK Style G Centrifugal Liquid Chiller 20...
Page 21: ...Figure 8 Spring isolators continued in mm 21 Model YK Style G Centrifugal Liquid Chiller...