FX70 Supervisory Controller Installation Instructions
20
9.
Reconnect the earth ground wire to the controller’s
grounding lug and any installed accessory
modules.
10. Reconnect any Ethernet, serial, modem, and I/O
connectors.
11. If using IO modules, and any of your I/O points
have voltage, turn the devices back on, or
reconnect power to them.
12. Replace the cover. See
13. Restore power to the unit. It should boot up as a
new unit (see
14. Use FX Workbench to re-commission the FX70
and install the saved station database.
COM Slot Assignments
Table 6 lists the COM slot assignments for the FX70
Controller.
Table 6: COM Slot Assignments for the FX70 Supervisory Controller (Part 1 of 2)
Option Slot 1
Option Slot 2
Onboard RS-232
Onboard RS-485
None
None
COM1
COM2
RS-232 = COM5
None
COM1
COM2
RS-232 = COM5
RS-232 = COM6
COM1
COM2
RS-232 = COM5
RS-485 = COM6, COM7
COM1
COM2
RS-232 = COM5
LON = LON1
COM1
COM2
RS-232 = COM5
Sedona = COM6
COM1
COM2
RS-232 = COM5
Modem = COM4
COM1
COM2
RS-232 = COM5
GPRS = COM6, COM7
COM1
COM2
RS-485 = COM5, COM6
None
COM1
COM2
RS-485 = COM5, COM6
RS-232 = COM7
COM1
COM2
RS-485 = COM5, COM6
RS-485 = COM7, COM8
COM1
COM2
RS-485 = COM5, COM6
LON = LON1
COM1
COM2
RS-485 = COM5, COM6
Sedona = COM7
COM1
COM2
RS-485 = COM5, COM6
Modem = COM4
COM1
COM2
RS-485 = COM5, COM6
GPRS = COM7, COM8
COM1
COM2
LON = LON1
None
COM1
COM2
LON = LON1
RS-232 = COM5
COM1
COM2
LON = LON1
RS-485 = COM5, COM6
COM1
COM2
LON = LON1
LON = LON2
COM1
COM2
LON = LON1
Sedona = COM5
COM1
COM2
LON = LON1
Modem = COM4
COM1
COM2
LON = LON1
GPRS = COM5, COM6
COM1
COM2
Sedona = COM5
None
COM1
COM2
Sedona = COM5
RS-232 = COM6
COM1
COM2
Sedona = COM5
RS-485 = COM6, COM6
COM1
COM2
Sedona = COM5
LON = LON1
COM1
COM2
Sedona = COM5
Modem = COM6
COM1
COM2
Sedona = COM5
GPRS = COM6,COM7
COM1
COM2
Modem = COM3
None
COM1
COM2
Modem = COM3
RS-232 = COM5
COM1
COM2
Modem = COM3
RS-485 = COM5, COM6
COM1
COM2
Modem = COM3
LON = LON1
COM1
COM2
Modem = COM3
Sedona = COM5
COM1
COM2