Johnson Controls E-Link Installation Instructions Manual Download Page 2

E-Link Gateway Installation Instructions

2

IMPORTANT:

The E-Link Gateway is intended to 

provide an input to equipment under normal 
operating conditions. Use this E-Link Gateway only 
as an operating control. Where failure or malfunction 
of the E-Link Gateway could lead to personal injury 
or property damage to the controlled equipment or 
other property, additional precautions must be 
designed into the control system. Incorporate and 
maintain other devices, such as supervisory or 
alarm systems or safety or limit controls, intended to 
warn of or protect against failure or malfunction of 
the E-Link Gateway.

Table 1:  YORK Chiller Models (Current 

Production)

Board 
Number

1

Language 
(Native)

Chiller Model

031-02550

BACnet®,
Modbus®,
YORK Talk 2,
4,800 bits per 
second (bps)

YCWL, YCUL, YCAL, 
YLAA, YCRL, YLPA

031-01095

YORK Talk 2, 
4,800 bps

YCAS, YCWS, YCRS

031-02478

YORK Talk 2,
4,800 bps

YCAV, YCIV, YVAA

031-01065

YORK Talk 2,
1,200 bps

YIA, YPC, YG, YB

031-01730

YORK Talk 3

YN, OM RETROFITS,
CR

031-02430

YORK Talk 3

YK, YT, YS, YR, YST,

YD, YMC

2

331-02496

BACnet®

YPAL

YORK-003

Modbus RTU

YEWS-D1, YEAS, 
YGAS

2

1.

Installing technician must verify board number in unit 
prior to installation.

2.

Software edition of YEWS-D1 (RHSYEWSD1) V1.08 or 
later), YEAS (RHMASB V1.06 or later), YGAS 
(RHMYGAS V1.03 or later) are supported.

Table 2:  E-Link Gateway Product Code Numbers

Description

Product Code 
Numbers

E-Link with Serial Outputs (BACnet 
Master-Slave/Token-Passing [MS/TP], 
Modbus Remote Terminal Unit [RTU], 
and N2)

YK-ELNK100-0

E-Link with L

ON

W

ORKS

® as an Output

YK-ELNK101-0

E-Link with Serial Outputs in 
Enclosure

YK-ELNKE00-0

E-Link with L

ON

W

ORKS

 Output in 

Enclosure

YK-ELNKE01-0

E-Link OptiView/Latitude Panel 
Installation Kit

YK-ELNKOLK-0

E-Link IPU-II Panel Installation Kit
(not available in Europe)

YK-ELNKSTK-0

Summary of Contents for E-Link

Page 1: ...Gateway circuit board a transformer is included inside the enclosure that converts a 120 or 240 volt input to 24 VAC power North American Emissions Compliance United States Canada Installation The E...

Page 2: ...YLPA 031 01095 YORK Talk 2 4 800 bps YCAS YCWS YCRS 031 02478 YORK Talk 2 4 800 bps YCAV YCIV YVAA 031 01065 YORK Talk 2 1 200 bps YIA YPC YG YB 031 01730 YORK Talk 3 YN OM RETROFITS CR 031 02430 YORK...

Page 3: ...re jumper JP27 is set for RS 232 see Figure 20 6 Connect the power harness included with the kit from J2 on the E Link Gateway to J21 on the Optiview Micro Panel see Figure 20 The E Link Gateway is no...

Page 4: ...ground screw The E Link Gateway is now ready to be configured using Quick Start see the Commissioning a Standard Application section in this document Micro Board 24 VAC Transformer Expansion Nut Expa...

Page 5: ...ateway enclosure to the Micro Panel 6 Complete wiring as described in the Applying Power section in this document Note Use of bulkhead pipe couplers provides sufficient clearance to allow removal of t...

Page 6: ...e metal of both enclosures Scraping the paint around the knockouts usually helps provide a better electrical connection between the joining parts 1 Connect a 1 29 1 02 mm 16 18 AWG wire from a reliabl...

Page 7: ...to the Johnson Controls Portal Products and Services Delivery Products Service Field Support Equipment Integration YORK Equipment Data Maps 3 Press hold a few seconds then release the push button show...

Page 8: ...1 through 16 all use the J version point lists whereas Quick Starts 17 through 33 use the K version The primary difference between the two categories is that Quick Starts 1 through 16 have limited net...

Page 9: ...IPU I 17 0 1 0 0 0 1 YK with SSS Imperial YORK Talk III K version points 18 0 1 0 0 1 0 YK with VSD Imperial YORK Talk III K version points 19 0 1 0 0 1 1 YT with SSS Imperial YORK Talk III K version...

Page 10: ...600 N 8 1 Terminal 4 2 5 0 1 0 0 N2 9 600 N 8 1 MS TP 38 400 N 8 1 Terminal 5 2 5 0 1 0 1 Modbus 19 200 N 8 1 MS TP 38 400 N 8 1 Terminal 6 2 5 0 1 1 0 Modbus 19 200 N 8 2 MS TP 38 400 N 8 1 Terminal...

Page 11: ...nzorbs on each RS 485 port to protect against damaging electrical spikes and stray voltage The equipment panel should also be equipped with protection against electrical disturbances Whereas OptiView...

Page 12: ...ctivity RS 485 The RS 485 standard uses three conductors to connect network nodes two signal wires and a reference The E Link Gateway uses either a third wire for the reference or the building s infra...

Page 13: ...ch setting 1 Since the E Link Gateway uses a one to one relationship with the chiller panel this switch is normally set to 0 YORK Talk address 1 However in a master slave configuration set the master...

Page 14: ...itude POWER HARNESS Latitude 3 8 in Screw 8 x 32 OptiView 2 Position Connector 4 Position Connector 4 Position Connector 4 Position Connector Screw Tap Thread M4 x 32 mm Latitude FIG OptiVwKt YMC2 COM...

Page 15: ...Transformer Primary Power Wiring Harness Communication Wiring Harness Resistor Secondary Power Wiring Harness Tie Wrap FIG IPUII Kt Figure 15 E Link IPU II Panel Installation Kit YK ELNKSTK 0 Contents...

Page 16: ...is dated after 11 2000 the chiller ID is software selectable through the micro panel SHIELD BLUE WHITE Open 031 02050 000 TB1 TB6 NOTE The chiller ID is software selectable through the micro panel ke...

Page 17: ...E Link Gateway Installation Instructions 17 Figure 18 E Link Gateway to YORK Talk II Equipment Connections Continued See Table 1 for board cross reference...

Page 18: ...s in locations U4 and U5 The transfer rate on the chiller must be set to 4800 baud Frick RWBII Plus Jumpers Jumpers RWBII Rev B and Lower RX Jumpers RWBII Rev C and Higher U5 U4 Port 2 Port 1 SHIELD P...

Page 19: ...lk 3 Rs232 Optiview Microboard 031 01730 XXX SHIELD PORT 2B RS232 TX RX COMSHLD Open E Link E Link 12 VDC SHIELD Open Equipment Cable York Talk 2 RS485 4800 baud SHIELD COM SHLD PORT 2A RS485 Open E L...

Page 20: ...xxx I O Board 331 02496 101 IPU I Board YPAL ECO2 1 J4 2 3 4 5 P3 P3 GND 5V Equipment Cable BACnet MS TP 38400 baud FIG YPAL YPAL ECO2 Setup for MS TP Bus BLUE WHITE SHIELD GRD COM SHLD PORT 2A RS485...

Page 21: ...s a pre wired E Link Port 2 Terminal Block RS485 4800 baud SHIELD PORT 2A RS485 Open E Link 031 02550 xxx I O Board 031 02630 xxx IPU II Board T 1 RS485 REF SHLD IPU II P1 Setup for York Talk 2 FIG ST...

Page 22: ...E Link Gateway Installation Instructions 22 Figure 23 E Link Gateway to Wuxi STC YEWS D1 YEAS YGAS Equipment Connection Fig wuxi_stc...

Page 23: ...E Link Gateway Installation Instructions 23 Figure 24 E Link Gateway Communication Port Connections to a BAS System...

Page 24: ...if this connection has not been made elsewhere in the configuration Repair Information If the E Link Gateway fails to operate within its specifications replace the unit For a replacement E Link Gatew...

Page 25: ...PP Switch Group A 6 Position Dip Switch Port 2A RS485 Equipment Port Supporting BACnet MS TP and YORK Talk II Protocols with Available EOL Termination Switch Port 2B RS232 Equipment Port Supporting YO...

Page 26: ...Installation Instructions 26 Metasys and Johnson Controls are registered trademarks of Johnson Controls Inc All other marks herein are the marks of their respective owners 2011 Johnson Controls Inc Bu...

Reviews: