Mounting the Plastic Box
Please read the following instructions, to get an overall
view of the steps involved in the control panel mounting
with the
ABS-P
Plastic Box: refer to Figure 5 and Fig-
e
To comply with the EN50131-1 and EN50131-3
standards, detach the cap
40
from the bottom, and
insert it into the hole
39
.
Installing ABSOLUTA Plus Main Board
1.
Slide the Main Board under the 2 tabs
67
.
2.
Secure the Main Board to the holes
60
on the
backplate using the two self tapping screws .
Installing BAQ15T12 Power Supply
Read the fol-
lowing steps to install the BAQ15T12 Power Supply,
otherwise
skip
to
“Installing
BAW35T12
and
BAW50T12 Power Supply”.
3.
Cut the battery cables on the power supply.
+
The backup battery must be connected to the con-
nector
13
on the Main Board. It can NOT be con-
nected directly to power supply.
4.
Using the 2 self tapping screws (3 x 8), secure the
BAQ15T12 to the holes
71
on the backplate..
5.
Connect one end of the earth wire (Yellow-Green)
28
to the Earth terminal
-
on the ABSOLUTA Plus
mainr board, and the other to terminal
Q
on the
BAQ15T12 Switching Power Supply.
!
The Main Board must be earthed in order to pro-
tect it from electrical surges from the Telephone
Line, and to comply with Safety Regulations.
6.
Plug the Switching Power Supply into the connec-
tor
12
on the ABSOLUTA Plus Main Board.
Installing BAW35T12 and BAW50T12 Power Supply
Read the following steps to install the BAW35T12 or
BAW50T12 Power Supply or skip to “Installing the Tam-
per Switch”.
7.
Cut the battery cables on the power supply.
+
The backup battery must be connected to the con-
nector
13
on the Main Board. It can NOT be con-
nected directly to power supply.
8.
BAW50T12
: slide the Power Supply tab under the
hook
72
.
BAW35T12
: screw a self tapping screw 3 x 8 mm
on the hole
71
, loosely, then slide the Power Supply
tab in the screw and tighten it.
9.
Using the self tapping screw (3 x 8), secure the
power supply to the hole
75
.
10.
Connect one end of the Earth wire (Yellow-Green)
to terminal
-
on the ABSOLUTA Plus Main Board,
and the other to terminal
Q
on the BAQ35T12
Switching Power Supply.
!
The Mother Main must be earthed in order to pro-
tect it from electrical surges from the Telephone
Line, and comply with Safety Regulations.
11.
Insert the Switching Power Supply plug into the
connector
12
on the ABSOLUTA Plus Main Board.
Installing the Tamper Switch
You can install the
MAXIASNC
switch (accessory item required to comply
with the EN50131-1 and EN50131-3 standards) to de-
tect the box opening, as shown in Figure 3 on page 17
(part nr.
25
).
12.
Insert the
MAXIASNC
switch into its location.
13.
Connect the wire to the connector
3
(
T
) on the Main
Board.
Installing the Wall-Tamper Switch
You can install
the
MAXIASNC
switch (accessory item required to
comply with the EN50131-1 and EN50131-3 standards)
to detect the box removal, as shown in Figure 3 on page
17 (part nr.
37
).
14.
Insert the
MAXIASNC
switch into its location.
15.
Connect the wire to connector
4
(
S
) on the Main
Board.
Installing the Input/Output Expander Module
You
can
install
one
Input/Output
Expander
Module
M-IN/OUT
into the Plastic Box, as shown in Figure 3 on
page 17 (part nr.
38
).
16.
Slide the Module PCB under the tab
78
.
17.
Secure the PCB to the hole
79
on the backplate, us-
ing the self tapping screw.
18.
Disable the tamper and wall-tamper contacts by in-
serting (closing) the jumper on the Input/Output Ex-
pander Module (
TAMP DIS
).
Marking Label
Once you have assembled the compo-
nents, specify on the data label (which is located on the
battery holder shelf) the type of Control Panel that you
have constructed.
19.
Using an indelible pen, tick the relevant box on the
Marking Label according to the following table.
ABS-P
Power Supplies
Main Boards BAQ15T12 BAW35T12 BAW50T12
ABS-18
ABS18P15
ABS18P35
N/A
ABS-48
N/A
ABS48P35
ABS48P50
ABS-128
N/A
N/A
ABS128P50
20
Expandable Hybrid Control Panel