·
5
·
2 Installation
2.1 Prepare Installation Tools
The following tools will be needed in inverter installation and wire connection.
Sketch map
Name
Recommend
specification
Function
Wire crimpers
M2.5~M8
Crimp the PV cable core in
connector tube for PV
connector.
Electric drill
Ф8
Used for drilling holes for
installation bracket.
Straight
screwdriver
Ф3
Used for AC side wire
installation
Cross
screwdriver
Ф5
Used for installing and
disassembling inverter cover
2.2 Installation Direction and spacing dimension
The inverter shall be installed vertically or tilted backwards with a maximum
angle of 10°
The minimum installation spacing dimensions are shown below:
Direction
Minimum spacing
Direction
Minimum spacing
Above
100cm
Sides
100cm
Below
100cm
Front
100cm