J2S Venice | J2S Rome | J2S Florence | J2S Milan | J2S Agrigento | J2S Naples | J900 | JS 32 | JS 43 | JS 49 | JS 55 | JS 65
J2S Venice
|
J2S Rome
|
J2S Florence
| J2S Milan | J2S Agrigento | J2S Naples | J900 | JS 32 | JS 43 | JS 49 | JS 55 | JS 65
58
59
A
8. MAINTENANCE
Suggestions
In case of failure, contact directly the manufacturer who will perform the
necessary operations.
JMC Group
HQ & Innovation Center:
Via Leonardo Da Vinci, 155,
20062, Cassano d’Adda – MI
Contattaci a:
T. +39.02.83591103
[email protected]
8.1 FAILURE
8.2 SWITCH FUSE REPLACEMENT
In case of damage to the fuse contained in the power switch of the totem
(15.)
,
due to an electrical failure, it is necessary to replace it:
1. Pull the central fuse holder (
A
) out of the switch
(15.)
;
2. Wear protective gloves and remove the fuse from its housing;
3. Insert a new fuse;
4. Reposition the support element (
A
) inside the switch.
To purchase a new fuse, contact a specialized shop.
A
Fuse holder
Summary of Contents for ITJ932P100-3Y
Page 32: ...62 ...