
14
VENTUS 3 ASSEMBLY
The rower has been assembled and tested at the factory, so you shouldn’t have any
problems putting all the parts together. Components are designed to fit together, and
only basic tools are required for the assembly process. Inside the box you will find a Tools
Pack (Hex Allen Key, Spanner, Washers and Bolts). See previous page.
To assemble your JLL VENTUS 3 please follow these easy steps:
STEP 1
Start by removing the two square neck bolts (9),
arc washers (10), spring washers (11) and nuts (12)
in the mainframe (27) and use them to attach the
front stabiliser (6).
STEP 2
Next, remove the two cross pan head screws (31)
from the end of the slideway. Slide the saddle onto
the frame and reattach the screws.
Then attach the two limiters (34) on the underside
of the slideway using two bolts (35) from the tools
pack.
STEP 3
Split the rail cover (36/37) into two pieces by
removing the screw (25). Then attach it over the
end of the slideway and secure using the screw just
removed.
Fix the rear supporter (38) to the underside of the
slideway using four Allen head bolts (24), flat
washers (3) and spring washers (11).
STEP 4
Remove the bolts (24) and washers (10+11) from the
mainframe (27).
Split the guide rail cover (26L/R) apart by removing
the screws (25).
Attach the slideway to the mainframe using the bolts
and washers removed earlier and then secure the
guide rail covers over the top using the screws.
36
37
25
3 11
24
3
11
24
24
11
3
33
38