SECTION 5 - BASIC HYDRAULIC INFORMATION & SCHEMATICS
5-26
3121200
8.
Install piston seal (8) and wear ring (7) onto piston (3).
9.
Carefully install piston on cylinder rod. Do not damage
or dislodge o-ring and backup rings.
10.
Install locknut (6) onto the rod.
11.
Remove cylinder rod from holding fixture.
12.
Position cylinder barrel in suitable holding fixture.
INSERTING ROD OFF-CENTER CAN DAMAGE PISTON AND CYLINDER BARREL
SURFACES. USE EXTREME CARE WHEN INSTALLING C YLINDER ROD, HEAD,
AND PISTON.
13.
Clamp barrel securely and support rod. Insert piston end
into barrel cylinder. Do not damage or dislodge piston
loading o-ring and seal ring.
14.
Screw the cylinder head gland into the barrel using a
tool and tighten until punch mark matches.
15.
After the cylinder has been reassembled, the rod should
be pushed all the way in (fully retracted) prior to the
reinstallation of any holding valve or valves.
MAE29330
3
9
7
8
Figure 5-38. Piston Disassembly
MAE29520
Figure 5-39. Cylinder Head Installation
Summary of Contents for T500J
Page 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Page 2: ......
Page 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Page 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Page 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Page 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Page 305: ......