Section 4- Operation
4-11
31211018
Placing a Suspended Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align load at the level load is to be placed, then position boom slowly until load is just
above area where it is to be placed.
• Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
• Never place the guide persons between the suspended load and the telehandler.
• Once at the destination of the load, ensure to bring the telehandler to a complete stop
and apply the park brake prior to disengagement of the lifting devices and tethers.
Summary of Contents for Skytrak 6036
Page 80: ...Section 4 Operation 4 14 31211018 This Page Intentionally Left Blank...
Page 89: ...Section 5 Attachments 5 9 31211018 This Page Intentionally Left Blank...
Page 134: ...Section 6 Emergency Procedures 6 4 31211018 This Page Intentionally Left Blank...
Page 143: ...Section 7 Lubrication and Maintenance 7 9 31211018 8042 10042 O 5731 H 50 EVERY...
Page 144: ...Section 7 Lubrication and Maintenance 7 10 31211018 10054 O 5711 H 50 EVERY...
Page 166: ...Section 8 Additional Checks 8 4 31211018 This Page Intentionally Left Blank...
Page 182: ...Index 4 31211018...
Page 184: ...Inspection Maintenance and Repair Log Date Comments...
Page 186: ......