SECTION 4 - MACHINE OPERATION
3121303
– JLG Lift –
4-5
NOTICE
THE LOAD SENSING SYSTEM MUST BE CALIBRATED WHEN ONE OR
MORE OF THE FOLLOWING CONDITIONS OCCUR:
a.
LSS component replacement.
b.
LSS Sensor removal or replacement.
c.
Platform is removed or replaced.
NOTICE
THE LOAD SENSING SYSTEM REQUIRES PERIODIC FUNCTION VERIFI-
CATION NOT TO EXCEED 6 MONTHS FROM PREVIOUS VERIFICATION.
REFER TO TESTING AND EVALUATION IN SECTION 6.
4.2 OPERATION
NOTE:
The platform control box can be plugged in at ground
level inside the valve compartment.
• There is an emergency stop switch positioned on the plat-
form control box (red button) and one located ground
level at the chassis. When activated, the signals of the
control board will be cut off instantly and all functions will
be stopped, except the functions emergency descent and
emergency lifting (at ground level). These will still work if
the emergency button at the control box is pressed.
• The Master Switch at the chassis acts as an isolator switch
for the batteries and cuts off the power supply.
• The auto leveling outriggers can be turned on or off (Out-
rigger-Switch ON/OFF). This is a keyswitch which is
located outside the hydraulic tank compartment. The acti-
vation of the outriggers is controlled by the lift select func-
tion. The lift up select allows the outriggers to extend. The
lift down select allows the outriggers to retract.
• The machine is equipped with a horn, which can be acti-
vated from the control box. While driving, a constant
acoustic signal is activated as an additional motion alarm.
Summary of Contents for LIFTLUX 210-25
Page 2: ......
Page 22: ...SECTION 1 SAFETY PRECAUTIONS 1 12 JLG Lift 3121303 NOTES...
Page 32: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 10 JLG Lift 3121303 NOTES...
Page 82: ......
Page 83: ......