Section 5 - Attachments
5-39
31200150
Installation Procedure:
• Refer to “Attachment Installation” on page 5-13.
Operation:
• Raise or lower boom to appropriate height and open grapple for loading material
from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to
load bucket.
• Tilt bucket up far enough to retain load, close grapple and back away from pile.
• Travel in accordance with requirements set forth in Section 1 - General Safety
• Open grapple and tilt bucket down to dump load.
Equipment Damage Precautions
• Except for lifting or dumping a load, the boom must be fully retracted for all
bucket operations.
• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
• Do not use bucket as a lever to pry material. Excessive prying forces could
damage bucket or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick switch or machine structure.
• Do not use bucket for "back dragging." This could cause severe damage to quick
switch and retraction cables/chains.
Summary of Contents for G10-43A
Page 24: ...Section 1 General Safety Practices 1 14 31200150 This Page Intentionally Left Blank...
Page 47: ...Section 3 Controls and Indicators 3 5 31200150 This Page Intentionally Left Blank...
Page 59: ...Section 3 Controls and Indicators 3 17 31200150 This Page Intentionally Left Blank...
Page 82: ...Section 4 Operation 4 14 31200150 This Page Intentionally Left Blank...
Page 137: ...Section 7 Lubrication and Maintenance 7 9 31200150 This Page Intentionally Left Blank...
Page 154: ...Section 8 Additional Checks 8 2 31200150 This Page Intentionally Left Blank...
Page 164: ...Index 4 31200150...
Page 166: ...Inspection Maintenance and Repair Log Date Comments...
Page 168: ......