
Section 5 - Attachments
5-36
31200150
Bucket
Use Appropriate Bucket Capacity Chart
To determine maximum capacity, refer to “Telehandler/
Attachment/Fork Capacity” on page 5-6.
The boom joystick (1) controls lift/lower and extend/retract movement of the boom.
The attachment tilt joystick (2) controls bucket tilt.
• Move joystick back to tilt up.
• Move joystick forward to tilt down.
Installation Procedure:
• Refer to “Attachment Installation” on page 5-13.
Operation:
• Raise or lower boom to appropriate height for loading material from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to
load bucket.
• Tilt bucket up far enough to retain load and back away from pile.
• Travel in accordance with requirements set forth in Section 1 - General Safety
• Tilt bucket down to dump load.
O
Z
0
7
3
0
O
Y
2221
1
2
Summary of Contents for G10-43A
Page 24: ...Section 1 General Safety Practices 1 14 31200150 This Page Intentionally Left Blank...
Page 47: ...Section 3 Controls and Indicators 3 5 31200150 This Page Intentionally Left Blank...
Page 59: ...Section 3 Controls and Indicators 3 17 31200150 This Page Intentionally Left Blank...
Page 82: ...Section 4 Operation 4 14 31200150 This Page Intentionally Left Blank...
Page 137: ...Section 7 Lubrication and Maintenance 7 9 31200150 This Page Intentionally Left Blank...
Page 154: ...Section 8 Additional Checks 8 2 31200150 This Page Intentionally Left Blank...
Page 164: ...Index 4 31200150...
Page 166: ...Inspection Maintenance and Repair Log Date Comments...
Page 168: ......