
SECTION 3 - CHASSIS & TURNTABLE
3121714
3-29
3.7
SWING BEARING
Turntable Bearing Mounting Bolt Condition Check
THE SWING BEARING IS ONE OF THE MOST CRITICAL POINTS ON AN AERIAL
LIFT. IT IS HERE THAT THE STRESSES OF LIFTING ARE CONCENTRATED, AT THE
CENTER OF ROTATION. BECAUSE OF THIS, PROPER MAINTENANCE OF THE
SWING BEARING BOLTS IS A MUST FOR SAFE OPERATION.
NOTE:
This check is designed to replace the existing bearing bolt
torque checks on JLG Lifts in service. This check must be
performed after the first 50 hours of machine operation
and every 600 hours of machine operation thereafter. If
during this check any bolts are found to be missing or
loose, replace missing or loose bolts with new bolts and
torque to the value specified in the torque chart, after lubri-
cating the bolt threads with JLG Threadlocker PN 0100019.
After replacing and retorquing bolt or bolts recheck all
existing bolts for looseness.
1.
Check the frame to bearing. Attach bolts as follows:
a. Elevate the fully retracted boom to 70 degrees (full
elevation).
b. At the positions indicated on Figure 3-22. try and
insert the 0.0015" feeler gauge between the bolt
head and hardened washer at the arrow indicated
position.
c. Assure that the 0.0015" feeler gauge will not pene-
trate under the bolt head to the bolt shank.
d. Swing the turntable 90 degrees, and check some
selected bolts at the new position.
e. Continue rotating the turntable at 90 degrees inter-
vals until a sampling of bolts have been checked in
all quadrants.
2.
Check the turntable to bearing. Attach bolts as follows:
a. Elevate the fully retracted boom to 70 degrees (full
elevation).
b. At the positions indicated on Figure 3-21. try and
insert the 0.0015" feeler gauge between the bolt
head and hardened washer at the arrow indicated
position.
c. Lower the boom to horizontal and fully extend the
boom.
d. At the position indicated on Figure 3-21. try and
insert the 0.0015" feeler gauge between the bolt
head and hardened washer at the arrow indicated
position.
Figure 3-21. Swing Bearing Feeler Gauge Check
Summary of Contents for E450A
Page 2: ......
Page 22: ...SECTION 1 SPECIFICATIONS 1 4 3121714 Figure 1 2 Maintenance Lubrication Diagram...
Page 51: ...SECTION 3 CHASSIS TURNTABLE 3121714 3 11 1001116232 A Figure 3 9 Drive Limit Switch...
Page 64: ...SECTION 3 CHASSIS TURNTABLE 3 24 3121714 1 0 Figure 3 18 Drive Hub Sheet 1 of 2...
Page 76: ...SECTION 3 CHASSIS TURNTABLE 3 36 3121714 Figure 3 27 Swing Components...
Page 96: ...SECTION 3 CHASSIS TURNTABLE 3 56 3121714 GENERATOR Figure 3 30 On Board Generator...
Page 116: ...SECTION 3 CHASSIS TURNTABLE 3 76 3121714 NOTES...
Page 343: ...SECTION 6 JLG CONTROL SYSTEM 3121714 6 27 CONNECTOR Figure 6 10 Power Module LH 1001192212 D...
Page 344: ...SECTION 6 JLG CONTROL SYSTEM 6 28 3121714 Figure 6 11 Power Module RH CONNECTOR 1001178339 E...
Page 479: ......