![JLG 80SL Service Maintenance Manual Download Page 48](http://html1.mh-extra.com/html/jlg/80sl/80sl_service-maintenance-manual_2020070048.webp)
SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS
3-12
– JLG Lift –
3121325
Installation:
1. Carefully insert Outrigger Cylinder (16) back into the
frame and secure with the four Bolts (14) and Lock-
washers (15).
2. Replace Gasket (13) and Plate (12). Secure with four
Bolts (10) and Lockwashers (11).
NOTE:
At this point the frame may be lowered.
3. Place Valve Assembly (7), Limit Switch Bracket (8),
and Limit Switch (9) back onto the top of the cylinder
and secure with the four Bolts (5) and Lockwashers
(6).
4. Reconnect all hydraulic lines and electrical wires.
5. Return flow of hydraulic oil and ensure there is no
leakage. Operate cylinder to ensure it works prop-
erly.
6. Replace Cover (1) and secure with four Bolts (2) and
Lockwashers (3).
C
D
10 11
12 13
14
15
16
16
10. Bolt, M6 x 16mm
11. Lockwasher, M6
12. Plate
13. Gasket
14. Bolt, M12 x 70mm
15. Lockwasher, M12
16. Outrigger Cylinder
Figure 3-9. Outrigger Cylinder Removal - (Sheet 2 of 2)
Summary of Contents for 80SL
Page 1: ...Service Maintenance Manual Model 80SL 3121325 March 24 2011...
Page 2: ......
Page 24: ...SECTION 1 SPECIFICATIONS 1 12 JLG Lift 3121325 NOTES...
Page 36: ...SECTION 2 GENERAL 2 12 JLG Lift 3121325 NOTES...
Page 80: ...SECTION 3 CHASSIS PLATFORM SCISSOR ARMS 3 44 JLG Lift 3121325 NOTES...
Page 106: ...SECTION 4 HYDRAULICS 4 26 JLG Lift 3121325 NOTES...
Page 155: ...SECTION 6 GENERAL ELECTRICAL INFORMATION SCHEMATICS 3121325 JLG Lift 6 37 NOTES...
Page 161: ......