SECTION 3 - CHASSIS & TURNTABLE
3121160
– JLG Lift –
3-85
3.20 TILT ALARM SWITCH (PRIOR TO S/N
0300062045)
PERFORM TILT ALARM SWITCH LEVELING PROCEDURE A MINI-
MUM OF EVERY SIX MONTHS TO ENSURE PROPER OPERATION
AND ADJUSTMENT OF SWITCH.
Manual Adjustment.
1.
Park the machine on a flat, level surface. Ensure
machine is level and tires are filled to rated pressure.
NOTE:
Ensure switch mounting bracket is level and securely
attached.
2.
Level the base of the indicator by tightening the
three flange nuts through approximately one quarter
of its spring travel. DO NOT ADJUST THE “X” NUT
DURING THE REMAINDER OF THE PROCEDURE.
3.
With the electrical connections complete, using bub-
ble level on top of indicator, slowly tighten or loosen
the three flange nuts until indicator is level.
4.
Individually push down on one corner at a time;
there should be enough travel to cause the switch to
trip. If the switch does not trip in all three tests, the
flange nuts have been tightened too far. Loosen the
“X” nut and repeat steps (2) through (4) LIMIT
SWITCHES ADJUSTMENTS.
3.21 SPARK ARRESTER CLEANING
INSTRUCTIONS
1.
1.
Remove the cleanout plug in the bottom of spark
arrester (muffler).
2.
Without causing deformation (or any type of dam-
age to the spark arrester) repeatedly tap on the
arrester near the cleanout plug. This may be enough
to begin drainage of the spark trap.
3.
An industrial vacuum cleaner can do a complete job
at this point.
a.
Or, IN A SAFE AREA, start the engine. Then
alternate between low idle and high idle for two
to three minutes.
b.
Or, operate the engine as required by the appli-
cation for two to three minutes.
4.
Install the cleanout plug. (See Table 2-5. Preventive
Maintenance and Inspection Schedule.)
Table 3-9. Coupling Port Information Table
Port
No.
Outlets
Port Size
Description
Operating
Pressure
PSI (Bar)
Proof
Pressure
PSI (Bar)
1
2
-6
Brake
450 (31)
675 (46.5)
2
2
-6
2 Speed
4500 (310) 6750 (465)
3
1
-6
Steer
2500 (138)
3750
(258.5)
4
1
-6
Steer
2500 (172)
3750
(258.5)
5
3
2-16, 1-6
Drive Reverse
4500 (310) 6750 (465)
6
1
-16
Drive Forward
4500 (310) 6750 (465)
7
2
-12
Drain
250 (17)
375 (26)
Figure 3-50. Tilt Switch Adjustment.
Summary of Contents for 740A
Page 1: ...Service and Maintenance Manual Models 740A 740AJ P N 3121160 January 8 2013 ...
Page 2: ......
Page 52: ...SECTION 2 GENERAL 2 12 JLG Lift 3121160 NOTES ...
Page 109: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 57 Figure 3 39 Swing Hub ...
Page 135: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 83 Figure 3 48 Rotary Coupling Port Location ...
Page 153: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 101 Figure 3 54 EFI Component Location ...
Page 156: ...SECTION 3 CHASSIS TURNTABLE 3 104 JLG Lift 3121160 Figure 3 55 ECM EPM Identification ECM EPM ...
Page 173: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 121 Figure 3 65 EMR2 Fault Codes Sheet 1 of 5 ...
Page 174: ...SECTION 3 CHASSIS TURNTABLE 3 122 JLG Lift 3121160 Figure 3 66 EMR2 Fault Codes Sheet 2 of 5 ...
Page 175: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 123 Figure 3 67 EMR2 Fault Codes Sheet 3 of 5 ...
Page 176: ...SECTION 3 CHASSIS TURNTABLE 3 124 JLG Lift 3121160 Figure 3 68 EMR2 Fault Codes Sheet 4 of 5 ...
Page 177: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 125 Figure 3 69 EMR2 Fault Codes Sheet 5 of 5 ...
Page 244: ...SECTION 4 BOOM PLATFORM 4 28 JLG Lift 3121160 Figure 4 14 Rotator Assembly HELAC ...
Page 286: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121160 NOTES ...
Page 307: ...SECTION 5 HYDRAULICS 3121160 JLG Lift 5 21 Figure 5 17 Variable Displacement Pump Rexroth ...
Page 316: ...SECTION 5 HYDRAULICS 5 30 JLG Lift 3121160 NOTES ...
Page 319: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 3 Figure 6 2 ADE Block Diagram ...
Page 328: ...SECTION 6 JLG CONTROL SYSTEM 6 12 JLG Lift 3121160 Figure 6 11 Control Module Location ...
Page 374: ...SECTION 6 JLG CONTROL SYSTEM 6 58 JLG Lift 3121160 NOTES ...
Page 406: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121160 NOTES ...
Page 407: ......