SECTION 3 - CHASSIS & TURNTABLE
3-54
– JLG Lift –
3120746
BE SURE THE EXCLUSION SEAL AND PRESSURE SEAL ARE
UNDAMAGED AND PROPERLY SEATED.
5. Clamp the motor in the vise so the output shaft is
vertical and down. Clamp on the mounting flange.
6. Pour clean hydraulic fluid into the motor to provide
start - up lubrication.
7. Lubricate and install one of the three largest diame-
ter seals in the groove in the motor housing.
8. Install the drive.
NOTE:
If the splined ends of the Drive are different lengths,
install the longer end into the shaft.
Motor Timing
1. Align shaft timing dot with any bolt hole. Bolt hole
will be used for timing reference.
2. Install spacer plate, and note the position of the
threaded hole in housing aligned with the timing dot
on shaft.
BE SURE THE SLOTS IN THE SPACER PLATE PROVIDE PAS-
SAGE FOR HYDRAULIC FLUID AS WELL AS THE CAP SCREWS.
IF THE SPACER PLATE IS FLIPPED THE MOTOR WILL NOT
OPERATE.
3. Lightly stretch, lubricate and install the second of the
three larger diameter seals in the groove in the
Geroler.
Standard Timing:
Align any star point with threaded
hole noted for the location of the timing dot.
Reverse Timing:
Align any star valley with the
threaded hole noted for the location of the timing
dot.
4. Rotate the geroler to align the screw holes and
install driver spacer if applicable.
5. Lubricate and install the last one of the three larger
diameter seals in the groove in the end cap.
6. Install the end cap and seven cap screws.
7. Tighten the cap screws, in a criss - cross pattern, to
300 in lbs. (34 Nm).
8. The level down relief valve is located right next to the
check port. Turn clockwise to increase and counter-
clockwise to decrease.
Summary of Contents for 601S
Page 1: ...Service and Maintenance Manual Model 601S P N 3120746 November 22 2016 ...
Page 2: ......
Page 4: ... JLG Lift THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 16: ...x JLG Lift 3120746 TABLE OF CONTENTS Continued This page left blank intentionally ...
Page 26: ...SECTION 1 SPECIFICATIONS 1 10 JLG Lift 3120746 Figure 1 3 Torque Chart ...
Page 36: ...SECTION 2 GENERAL 2 10 JLG Lift 3120746 Figure 2 7 Connector Installation ...
Page 40: ...SECTION 2 GENERAL 2 14 JLG Lift 3120746 This page left blank intentionally ...
Page 49: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 9 Figure 3 1 Torque Hub Drive Fairfield ...
Page 51: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 11 Figure 3 2 Torque Hub Drive Auburn Gear ...
Page 53: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 13 Figure 3 3 Drive Brake Assembly Ausco ...
Page 91: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 51 Figure 3 40 Swing Brake Assembly Ausco ...
Page 99: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 59 ...
Page 119: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 79 Figure 3 46 EFI Component Location ...
Page 122: ...SECTION 3 CHASSIS TURNTABLE 3 82 JLG Lift 3120746 Figure 3 47 ECM EPM Identification ECM EPM ...
Page 128: ...SECTION 3 CHASSIS TURNTABLE 3 88 JLG Lift 3120746 This page left blank intentionally ...
Page 132: ...SECTION 4 BOOM PLATFORM 4 4 JLG Lift 3120746 Figure 4 5 Boom Assembly Cutaway Sheet 1 of 2 ...
Page 133: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 5 Figure 4 6 Boom Assembly Cutaway Sheet 2 of 2 ...
Page 145: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 17 Figure 4 22 Rotator Assembly Helac ...
Page 148: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3120746 This page left blank intentionally ...
Page 174: ...SECTION 5 HYDRAULICS 5 26 JLG Lift 3120746 This page left blank intentionally ...
Page 176: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 2 JLG Lift 3120746 Figure 6 1 EPBCS Block Diagram ...
Page 238: ...SECTION 7 SCHEMATICS 7 16 JLG Lift 3120746 Figure 7 15 Hydraulic Schematic Sheet 1 of 4 ...
Page 240: ...SECTION 7 SCHEMATICS 7 18 JLG Lift 3120746 Figure 7 17 Hydraulic Schematic Sheet 3 of 4 ...
Page 242: ...SECTION 7 SCHEMATICS 7 20 JLG Lift 3120746 This page left blank intentionally ...
Page 243: ......