SECTION 3 - CHASSIS & TURNTABLE
3120746
– JLG Lift –
3-41
20. Install orifice poppet (30).
21. Install shift spool (31).
22. Install spring retaining washers onto springs (32 and
33).
23. Carefully install centering springs (34, 35, and 36).
24. Install new O-rings (37, 38, and 39).
25. Using a 5/8 in wrench torque plug (40) to 20 ft.lbs.
(27 Nm).
26. Using a 11/16 in wrench, torque plugs (41 and 42) to
27 ft.lbs. (37 Nm).
Initial Start-up Procedures
Follow this procedure when starting-up a new motor or
when installing a motor that has been removed.
Prior to installing the motor, inspect for damage incurred
during shipping. Make certain all system components
(reservoir, hoses, valves, fittings, heat exchanger, etc.) are
clean prior to filling with fluid.
1. Fill the reservoir with recommended hydraulic fluid.
Always filter fluid through a 10 micron filter when
pouring into the reservoir. Never reuse hydraulic
fluid.
2. Fill the inlet line leading from the pump to the reser-
voir. Check the inlet line for properly tightened fit-
tings and be certain it is free of restrictions and air
leaks.
3. Fill the pump and motor housing with clean hydrau-
lic fluid. Pour filtered oil directly into the upper most
case drain port.
4. To ensure the pump and motor stay filled with oil,
install case drain lines into the upper most case
drain ports.
5. Install a 0 to 500 psi (0 to 35 bar) gauge in the
charge pressure gauge port of the pump to monitor
system pressure during start up.
6. While watching the pressure gauge, run the engine
at the lowest possible speed until system pressure
builds to normal levels (minimum 160 psi [11 bar]).
Once system pressure is established, increase to full
operating speed. If system pressure is not main-
tained, shut down the prime mover, determine
cause, and take corrective action.
7. Operate the hydraulic system for at least fifteen min-
utes under light load conditions.
8. Check and adjust control settings as necessary after
installation.
9. Shut down the prime mover and remove the pres-
sure gauge. Replace plug at the charge pressure
gauge port.
10. Check the fluid level in the reservoir; add clean fil-
tered fluid if necessary. The motor is now ready for
operation.
3.8 FREE WHEELING OPTION
To Disengage Drive Motors and Brakes (Free
Wheel) for Towing, etc.
1. Chock wheels securely if not on flat level surface.
39
40
34
30
41
37
36
33
42
38
35
32
31
(27 Nm)
20 ft.lbs.
5/8 in
(37 Nm)
(37 Nm)
27 ft.lbs.
27 ft.lbs.
11/16 in
11/16 in
30. Orifice Poppet
31. Shift Spool
32. Spring
33. Spring
34. Spring
35. Spring
36. Spring
37. O-ring
38. O-ring
39. O-ring
40. Plug
41. Plug
42. Plug
Figure 3-29. Loop Flushing Spool
Summary of Contents for 601S
Page 1: ...Service and Maintenance Manual Model 601S P N 3120746 November 22 2016 ...
Page 2: ......
Page 4: ... JLG Lift THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 16: ...x JLG Lift 3120746 TABLE OF CONTENTS Continued This page left blank intentionally ...
Page 26: ...SECTION 1 SPECIFICATIONS 1 10 JLG Lift 3120746 Figure 1 3 Torque Chart ...
Page 36: ...SECTION 2 GENERAL 2 10 JLG Lift 3120746 Figure 2 7 Connector Installation ...
Page 40: ...SECTION 2 GENERAL 2 14 JLG Lift 3120746 This page left blank intentionally ...
Page 49: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 9 Figure 3 1 Torque Hub Drive Fairfield ...
Page 51: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 11 Figure 3 2 Torque Hub Drive Auburn Gear ...
Page 53: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 13 Figure 3 3 Drive Brake Assembly Ausco ...
Page 91: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 51 Figure 3 40 Swing Brake Assembly Ausco ...
Page 99: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 59 ...
Page 119: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 79 Figure 3 46 EFI Component Location ...
Page 122: ...SECTION 3 CHASSIS TURNTABLE 3 82 JLG Lift 3120746 Figure 3 47 ECM EPM Identification ECM EPM ...
Page 128: ...SECTION 3 CHASSIS TURNTABLE 3 88 JLG Lift 3120746 This page left blank intentionally ...
Page 132: ...SECTION 4 BOOM PLATFORM 4 4 JLG Lift 3120746 Figure 4 5 Boom Assembly Cutaway Sheet 1 of 2 ...
Page 133: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 5 Figure 4 6 Boom Assembly Cutaway Sheet 2 of 2 ...
Page 145: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 17 Figure 4 22 Rotator Assembly Helac ...
Page 148: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3120746 This page left blank intentionally ...
Page 174: ...SECTION 5 HYDRAULICS 5 26 JLG Lift 3120746 This page left blank intentionally ...
Page 176: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 2 JLG Lift 3120746 Figure 6 1 EPBCS Block Diagram ...
Page 238: ...SECTION 7 SCHEMATICS 7 16 JLG Lift 3120746 Figure 7 15 Hydraulic Schematic Sheet 1 of 4 ...
Page 240: ...SECTION 7 SCHEMATICS 7 18 JLG Lift 3120746 Figure 7 17 Hydraulic Schematic Sheet 3 of 4 ...
Page 242: ...SECTION 7 SCHEMATICS 7 20 JLG Lift 3120746 This page left blank intentionally ...
Page 243: ......