Section 4 - Operation
4-10
31200743
Placing a Suspended Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align load at the level load is to be placed, then position boom slowly until load is just
above area where it is to be placed.
• Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
• Never place the guide persons between the suspended load and the telehandler.
• Once at the destination of the load, ensure to bring the telehandler to a complete stop
and apply the park brake prior to disengagement of the lifting devices and tethers.
Summary of Contents for 2505H
Page 12: ...Table of Contents vi 31200743...
Page 31: ...Section 2 Pre Operation and Inspection 2 3 31200743 This Page Intentionally Left Blank...
Page 44: ...Section 2 Pre Operation and Inspection 2 16 31200743 This Page Intentionally Left Blank...
Page 70: ...Section 3 Controls and Indicators 3 26 31200743 This Page Intentionally Left Blank...
Page 84: ...Section 4 Operation 4 14 31200743 This Page Intentionally Left Blank...
Page 101: ...Section 5 Attachments and Hitches 5 17 31200743 This Page Intentionally Left Blank...
Page 120: ...Section 6 Emergency Procedures 6 4 31200743 This Page Intentionally Left Blank...
Page 127: ...Section 7 Lubrication and Maintenance 7 7 31200743 This Page Intentionally Left Blank...
Page 140: ...Section 7 Lubrication and Maintenance 7 20 31200743 This Page Intentionally Left Blank...
Page 154: ...Index 4 31200743...
Page 156: ...Inspection Maintenance and Repair Log Date Comments...
Page 158: ......