Section 4 - Operation
4-7
31200743
Placing a Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align forks at the level load is to be placed, then extend boom slowly until load is just
above area where it is to be placed.
• Lower the boom until the load rests in position and the forks are free to retract.
Disengaging a Load
Once the load has been placed safely at the landing point, proceed as follows:
1. With the forks free from the weight of the load, the boom can be retracted
and/or the telehandler can be backed away from under the load if surface will not
change level condition of telehandler.
2. Lower the carriage.
3. The telehandler can now be driven from the landing location to continue work.
Summary of Contents for 2505H
Page 12: ...Table of Contents vi 31200743...
Page 31: ...Section 2 Pre Operation and Inspection 2 3 31200743 This Page Intentionally Left Blank...
Page 44: ...Section 2 Pre Operation and Inspection 2 16 31200743 This Page Intentionally Left Blank...
Page 70: ...Section 3 Controls and Indicators 3 26 31200743 This Page Intentionally Left Blank...
Page 84: ...Section 4 Operation 4 14 31200743 This Page Intentionally Left Blank...
Page 101: ...Section 5 Attachments and Hitches 5 17 31200743 This Page Intentionally Left Blank...
Page 120: ...Section 6 Emergency Procedures 6 4 31200743 This Page Intentionally Left Blank...
Page 127: ...Section 7 Lubrication and Maintenance 7 7 31200743 This Page Intentionally Left Blank...
Page 140: ...Section 7 Lubrication and Maintenance 7 20 31200743 This Page Intentionally Left Blank...
Page 154: ...Index 4 31200743...
Page 156: ...Inspection Maintenance and Repair Log Date Comments...
Page 158: ......