Section 4 - Operation
4-6
31200743
Transporting a Load
• After engaging the load and resting it against the backrest, tilt the load back to
position it for travel. Travel in accordance with the requirements set forth in Section 1-
General Safety Practices and Section 5 - Attachments and Hitches.
• Maintain a slow speed when transporting a load.
Leveling Procedure
1. Position machine in best location to lift or place load.
2. Apply parking brake and move transmission control lever to NEUTRAL.
3. Observe level indicator to determine whether machine must be leveled prior to
lifting load.
4. Move boom/attachment to 4 ft (1,2 m) off ground.
(AUS - Move boom so forks are no more than 300 mm (11.8 in) above ground
surface.)
Important things to remember:
• Never raise the boom/attachment more than 4 ft (1,2 m) above ground unless
telehandler is level.
(AUS - Never raise the forks more than 300 mm (11.8 in) above ground surface unless
telehandler is level.)
• The combination of side tilt and load could cause the telehandler to tip over.
OW05
4
0
Summary of Contents for 2505H
Page 12: ...Table of Contents vi 31200743...
Page 31: ...Section 2 Pre Operation and Inspection 2 3 31200743 This Page Intentionally Left Blank...
Page 44: ...Section 2 Pre Operation and Inspection 2 16 31200743 This Page Intentionally Left Blank...
Page 70: ...Section 3 Controls and Indicators 3 26 31200743 This Page Intentionally Left Blank...
Page 84: ...Section 4 Operation 4 14 31200743 This Page Intentionally Left Blank...
Page 101: ...Section 5 Attachments and Hitches 5 17 31200743 This Page Intentionally Left Blank...
Page 120: ...Section 6 Emergency Procedures 6 4 31200743 This Page Intentionally Left Blank...
Page 127: ...Section 7 Lubrication and Maintenance 7 7 31200743 This Page Intentionally Left Blank...
Page 140: ...Section 7 Lubrication and Maintenance 7 20 31200743 This Page Intentionally Left Blank...
Page 154: ...Index 4 31200743...
Page 156: ...Inspection Maintenance and Repair Log Date Comments...
Page 158: ......