SECTION 2 - PROCEDURES
3120686
– JLG Lift –
2-61
TURNTABLE
1.
Engine Oil (see mfg. manual)
3
5
2.
Battery
3
5
3.
Radiator
3, 5
4.
Air Cleaner
1
14
5.
Exhaust System
1
1,5
7.
Engine Mount
1
8.
Ground Controls
1,2,11
9.
Main Hydraulic Pump
1
5
10.
Auxiliary Power Pump
1
5
11.
Valves
1,11
5
12.
Hydraulic Filters
5, 14
14
13.
Hydraulic Hoses
1
5
14.
Hydraulic Oil Tank**
3
5
4
15.
Breather Hydraulic Tank
6,14
16.
Fuel Tank
3,5
4
17.
Cylinders
1,5,6,13
4, 12
19.
Turntable Locking Pin
1,7
20.
Horizontal Limit Switch
1,7
21.
Oil Coupling
5
22.
Placards and Decals
1,2
Tilt Alarm Switch
1, 7
23.
Swing Bearing
1
9, 12
24.
Swing Brake
1,5,6
8
25.
Swing Hub
1, 3, 5,6
10
Table 2-7.Preventive Maintenance and Inspection Schedule
AREA
DAILY
WEEKLY
INTERVAL
MONTHLY
3 MONTH
6 MONTH
YEARLY
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com