SECTION 3 - BASE COMPONENTS
3-24
– JLG Lift –
3121228
Brush Carrier Assembly - Remove/Install
Brush Assembly - Remove/Install
Tank Remove/Install
Brush Carrier Assembly - Remove/Install
1.
Stator/Brush Carrier Screws (Pump Rear)
2.
Stator/Brush Carrier Screws (Pump Front) (a)
3.
Mark Brush Carrier Position on Motor Housing
4.
Brush Carrier Assembly
NOTE:
(a) Removed previously with motor cover disassembly (shown for reference only).
1
3
4
Brush Assembly - Remove/Install
1.
Brush Assembly (a)
2.
Brush Carrier Socket
3.
Brush Tab Slot
4.
Brush Terminal Screw
5.
Brush Attach Terminal
NOTE:
(a) Slide brush assembly into socket until tab is in slot at
rear of socket.
1
4
2
3
3
5
Tank - Remove/Install
• For reassembly reference, place a mark on t ank and valve body.
1.
Tank Assembly
3.
O-Ring Seal (a)
2.
Tank Screws (Qty. 4)
4.
Reference Mark
Note: (a) Lubricate o-ring with clean hydraulic fluid before sliding
tank over during installation.
2
3
1
2