background image

14 Coleman Ave. Westfield, MA 01085

 413-527-1893

690 Island Way Unit 206, Clearwater, FL 33767

413-427-3373

jjmboilerworks.net

Revised - March, 2019

CBM

-226

Installation Operation 

& Maintenance

Model: CBM-226

Acidic Condensate pH Treatment Tube

Summary of Contents for CBM-226

Page 1: ...estfield MA 01085 413 527 1893 690 Island Way Unit 206 Clearwater FL 33767 413 427 3373 jjmboilerworks net Revised March 2019 CBM 226 Installation Operation Maintenance Model CBM 226 Acidic Condensate pH Treatment Tube ...

Page 2: ...usedbythefollowing A Improper Combustion B Contaminated Combustion Air C High Sulfur Content in Gas Supply D pH below 2 0 is considered hazardous waste by EPA Contact JJM Technical Service at 413 427 3373 or 413 527 1893 JJM highly recommends operating your heating equipment for 24 48 hours prior to connecting a neutralizer so as to flush out dirt grease and oils from connected piping and the heat...

Page 3: ...onal injury death or major property damage CAUTION Indicates a condition or hazard which will or can cause minor personal injury or property damage NOTICE Indicatesspecialattentionisneeded butnotdirectlyrelated to potential injury or property damage NOTICE This unit when installed must be electrically grounded in accordance with the requirements of the authority having jurisdiction or in the absen...

Page 4: ...ndensate pH needs to be increased made more neutral to prevent possible damage to cast iron soil pipe ABS pipe septic tanks plants wastewater treatment plants and other materials handling waste water CBM condensate pH treatment tubes increase pH reduce acidity CBM fire side condensate neutralizing tubes are designed to raise the pH level of the condensate discharged by high efficiency boilers warm...

Page 5: ...e unions in the piping to allow removal of the CBM tube for inspection and service Secure pipe or tubing in place Protect with a shield if necessary if routed through traffic areas R Use hose clamps at all connections when using plastic tubing S Condensate drain termination at floor drain or condensate pump reservoir inlet secure in place with clamps Follow instruc tions for condensate pump T Elev...

Page 6: ...vice technician immediately if flow through the overflow line is frequent or steady Make sure the installation complies with all local code requirements Piping for multiple boilers furnaces vent see figures 6 7 8 9 and 10 A Boilers Hot Water Heaters Furnace Condensate Drains B By pass Drain C By pass Piping D pH Treatment Tube E House Drain F Boiler Hot Water Heater Furnace Condensate Drain Note C...

Page 7: ...rs Individual pH Treatment Kits Common Piping C D E F Boilers Hot Water Heater Condensate Common Drain Common Flue Vent Neutralizer Tube or Tank House Drain Boilers Hot Water Heaters Furnaces Note Contact Factory for Neutralizer Sizing and Piping Sizing F F F F D D D D A E D Figure 7 Piping for Single Heating Unit with Common pH Treatment Tube or Tank A Boilers Hot Water Heaters Furnace Condensate...

Page 8: ... outlet falls below 5PH Local codes may have different requirement check with local authority Replacement parts Contact your local wholesaler or manu facturer s representative for replacement parts Dealerlistingatwww jjmboilerworks com OUTDOOR INSTALLATIONS provide and install electric heat tape and insulation on the condensate drain lines and around the tube to prevent possibility of neutralizer ...

Page 9: ... water to flush out the tank If your neutralizer pellets are incased in a porous pellet bag there are three methods to agitating the pellets 1 Remove the pellet bag or bags from the tank and using your hands move the pellets around inside the bags 2 Using a five gallon bucket filled with fresh tap water use step one with the bag under water 3 Using a fresh water hose slowly pour fresh water over b...

Reviews: