![Jesco Lutz PVC GF-2 Operating Instructions Manual Download Page 5](http://html1.mh-extra.com/html/jesco/lutz-pvc-gf-2/lutz-pvc-gf-2_operating-instructions-manual_3772236005.webp)
Notes for the Reader
Instruction for action identification
5
© Lutz-Jesco GmbH 2016
Subject to technical changes.
161025
BA-12204-01-V02
PVC GF-2 suction line
Operating instructions
1.5 Instruction for action identification
This is how pre-conditions for action are identified:
ü
Pre-condition for action which must be met before taking action.
This is how instructions for action are identified:
è
Separate step with no follow-up action.
1.
First step in a series of steps.
2.
Second step in a series of steps.
4
Result of the above action.
ü
Action completed, aim achieved.
1.6 General safety precautions
WARNING!!
Chemical burns or other burns through dosing medium!
You may come into contact with dosing equipment when working on
the filler unit.
ð
Wear appropriate personal protective equipment, especially for the
protection of eyes and skin.
ð
Avoid skin contact with the dosing medium.
ð
Check that all the screw connections have been tightened
correctly and are leak-proof.
ð
Never look into open ends of plugged hoses and valves.