JEI GroupLtd
AIRBEAST 35 ATEX
AIRBEAST 35
ATEX Operator’s Manual
13
Once the hole is accomplished, retract the cutter from the workpiece and stop the
motor by rotating the MOTOR lever counterclockwise to the horizontal position. To
move
the
machine
to
another
drilling
spot,
first
disable
the
magnetic base by positioning
the MAGNET switch in position OFF.
Once the work is finished, unplug the machine from the supply, clean chips and
coolant remainder from the machine and cutter, after which remove the machine from
the worksite.
Press the pilot to expel the coolant remaining within the system. Before inserting the
drilling machine into the toolbox, disassemble the cooling system bottle and remove
the cutter from the arbor using protective gloves.
3.4. Maintenance of air preparation unit
Maintain the air preparation unit as required to keep the water trap drained, filter
cleaned, and the lubricator oil reservoir filled so that there is a drop of oil every 2
–5
seconds. Use only oil which ignition temperature exceeds 260°C (500°F). If the
machine is to be left idle for at least 24 hours, increase the delivery of oil and run the
motor for 2
–3 seconds, which will prevent rusting and degrading of the rotor vanes.
When the cutter goes through the material, the slug core
is expelled from the tool with a significant force.