background image

 

34

 

13. List of technical documents 

 

I.  Supplier spare parts. 

 

1.

 

Hydraulic equipment N

o

902 011-1-A feed conveyor reducer gearbox. 
904 063-2-A Spool valve components. 
904 126-1-A 6/2 circuit selector. 
904 037-1-A Hydraulic actuator. 
904 038-1-A Anti-return valve and coupler on return line. 
900 002-1-A Uneven speed on feed conveyor. 
 

2.

 

Electrical equipment N

o

- 902 001-1-A Feed conveyor flow regulator. 
- 902 014-A Electrical actuator. 
 

3.

 

Electrical and hydraulic diagrams N

o:

 

902 113-1-A PR 2000 R Electrical control with spool valve + flow divider 45 l/min, Ref 
tarif: 8663 + 8958. 
- 902 114-1-A PR 2000 RGT direct tractor, Ref tarif: 8561. 
- 902 115-1-A PR 2000 RGT direct t electrical feed conveyor speed regulator, Ref 
tarif: 8561 + 8662 
- 902 116-1-A PR 2000 RGT Electrical control with spool valve, Ref tarif: 8664. 
- 902 117-1-A PR 2000 RGT Electrical control with spool valve + flow divider 45 l/min, 
Ref tarif: 8664 + 8958. 
- 902 110-1-A PR 2000 R direct tractor, Ref tarif: 8560. 
- 902 011-1-A PR 2000 R direct t electrical feed conveyor speed regulator, Ref 
tarif: 8560 + 8662 
- 902 112-1-A PR 2000 R Electrical control with spool valve, Ref tarif: 8663. 
 

4.

 

Drive shafts N

o:

 

904 048-1-A (mounted) Standard WALTERSCHEID drive shaft N

o

 811087. 

- 904 051-1-A (Semi-trailer) Standard WALTERSCHEID drive shaft N

o

 811064. 

 

5.

 

Gearbox N

o:

 

- 902 002-1-A Two-speed gearbox with side output COMER N

o

 814184. 

902 124-1-A Two-speed gearbox with side output GB N° 814199. 

II. JEANTIL spare parts. 

 

- 902 119-1-A Double bottom PR 2000. 
- 902 120-1-A Exploded view of gearbox output shaft PR 2000. 
- 902 121-1-A Shredder PR 2000. 
- 902 122-1-A Rigid axle PR 2000. 
- 902 123-1-A Chute PR 2000. 
- 902 125-1-A Turbine and blades PR 2000. 
- 902 126-1-A Door and extension PR 2000. 
 

Summary of Contents for PR 2000 R

Page 1: ...PMENT Mounted straw blower PR 2000 R PR 2000 R GT 3 Point linkage Semi trailer straw blower PR 2000 R PR 2000 R GT Rigid axle JEANTIL Rue de la Tertrais ZI La Hauti re BP1 35590 L HERMITAGE France Tel...

Page 2: ...ng the equipment Comply with the instructions and the safety related advice b Warning symbols This warning symbol identifies important advice that must be followed for your safety When you see this sy...

Page 3: ...esignated below PR 2000 R PR 2000 R GT SERIAL N COMPLIES WITH 1 Labour regulations 2 The revised European equipment directive N 98 37 EC 3 Revised EMC directive electromagnetic compatibility N 89 336...

Page 4: ...ilities p 8 5 Technical characteristics p 8 6 General safety rules p 11 1 General p 11 2 Warnings labels p 12 3 Coupling p 16 4 PTO Drive shaft p 16 5 Clogging or blockage of the equipment p 17 6 Main...

Page 5: ...operation p 27 1 Loading p 27 2 Mulching p 29 3 Spreading using round wrapped bales of silage and hay p 31 11 Additional equipment information p 32 1 Hydraulic flow divider for tractor flow rates exce...

Page 6: ...tion P T A C R ceptionn Masses maximales admissibles Anneau Essieu 1 Essieu 2 kg kg kg kg 20 kg Essieu 3 35590 L HERMITAGE FRANCE Ref 892 770 Manufacturer s plate to EC standards Never remove the manu...

Page 7: ...ave carefully read this Manual have understood it and applied all the safety instructions Once working it will be too late to do this c Definition of work stations 1 The work station for the equipment...

Page 8: ...nical electrical hydraulic or pneumatic characteristics without requesting prior written approval from the manufacturer 4 Failure to comply with these requirements may make the machinery dangerous The...

Page 9: ...d 1 91m 1 91m G Width with chute deployed 2 04m 2 04m H Container internal height 1 10m 1 10m I Overall height chute deployed 2 42m 2 42m J Overall height chute folded 2 21m 2 21m K Minimum spreading...

Page 10: ...10 2 Lifting and tie down diagram Mounted Semi trailer ISO 3767 1 standard lifting point symbol 7 29 ISO 3767 1 standard attachment point symbol 7 34 C of G C of G...

Page 11: ...atform and means of access to the work station 8 Before carrying out any work on the equipment ensure that it cannot be started up accidentally 9 All controls cords cables push rods hoses etc must be...

Page 12: ...legible If they are damaged ask for new labels from the manufacturer or agent 3 If repairs are carried out check that the replacement parts carry the same labels as those that have been removed Ref 8...

Page 13: ...e metal casing of the drive shaft Placed to the rear R and L on the sides of the body and on the forward face of the equipment Placed low down R and L on the sides of the body Placed on the metal casi...

Page 14: ...e greaser Shredder bearing greaser Feed conveyor shaft bearing greaser Actuator upper spindle greaser Gearbox output shaft greaser Shredder bearing greaser Feed conveyor shaft bearing greaser The shre...

Page 15: ...s depending on equipment and options placed on the electrical control unit located on the forward face of the unit Standard Electrical regulator Electrical distributor Standard Electrical regulator El...

Page 16: ...not create either an overload or poor weight distribution on the tractor that might compromise stability Do not exceed the maximum allowed loading for the tractor and equipment attachment points Wher...

Page 17: ...the turbine gearbox Low gear 270 rpm for spreading High gear 540 rpm pour mulching 11 Enter the tractor cab 12 Start the tractor 13 Close the rear door 14 Engage the tractor PTO while rotating the tu...

Page 18: ...operation on the equipment disconnect the electrical supply and the tractor battery 2 Disconnect and protect any hoses particularly rubber and any electrical cables to ensure that they are not damage...

Page 19: ...r casings must be replaced immediately 5 The operation of any original protective device fixed to the equipment must not be modified 6 Hydraulic hoses that originate from another hydraulic system must...

Page 20: ...n 4 Check condition of the safety guard If it shows any sign of damage it must be replaced before the equipment is used 5 The drive shaft links the tractor to the straw blower 6 Fit the primary straw...

Page 21: ...am of the PRESSURE orifice on the spool valve pack or contact your dealer to check whether it is possible to adjust tractor fluid flow rate 9 Closed circuit tractor e g John DEERE a To operate the equ...

Page 22: ...round 2 ATTACHING THE ELECTRIC CONTROL UNIT 1 The electrical control unit hangs on the hook provided on the front face of the equipment when it is detached from the tractor 2 A 2nd hook is delivered w...

Page 23: ...on 2 Adjustment is achieved using the adjusting rod in steps to left or right using a 21 mm open ended spanner 3 In the upper position the check dimension is between 910 915 mm 4 For a specific applic...

Page 24: ...d limits the unit s output 5 CHAIN TENSION A Feed conveyor drive chains 1 Follow the instructions on the stickers at the back of the unit for feed conveyor chains see page 11 24 mm spanner 2 Check tig...

Page 25: ...ure for replacement without draining the oil 1 Remove the lower casing cover by unscrewing the 6 x 10 mm screws using a 17 mm spanner 2 Avoid damaging the gasket 3 Remove the casing filler screw using...

Page 26: ...rious lubrication points are arranged as follows 1 grease nipple on the upper spindles of the 2 rear door actuators 1 grease nipple on each of the 2 shredder bearings 1 grease nipple on each of the 2...

Page 27: ...reliable and satisfactory service if used within their normal limits 2 Never exceed the stated maximum load 3 Before loading the straw blower when first used and every time after a period of inactivit...

Page 28: ...r onto the ground 2 Fully open the door 3 Stop the tractor engine 4 Unlock the door extension closure hoop by slightly lifting and holding the horizontal section of the hoop then pressing on the side...

Page 29: ...r extension is mainly intended for use with large square BIG BALES From the tractor cab close the door to roll the bale into the hopper 2 MULCHING Ensure that under no circumstances during operation d...

Page 30: ...bolts 24 mm spanner 10 Move the outlet chute in the vertical plane to achieve even mulching Note If the straw blower is fitted with a rotating outlet chute use this function to vary the trajectory in...

Page 31: ...ry the trajectory in the horizontal plane Rotate it smoothly and carefully 13 During the second part of the mulching as the bale is moved forward by the feed conveyor the door no longer bears the weig...

Page 32: ...the round bale is turning regularly adjust the feed conveyor speed if necessary to maintain regular rotation maintain the highest possible feed conveyor speed 11 If the straw blower is fitted with a...

Page 33: ...sure water jet is used do not hold this too close to the straw blower avoid directing the jet at electronic components the engine or electrical connections hydraulic lines and hoses seals filler plug...

Page 34: ...ectrical control with spool valve Ref tarif 8664 902 117 1 A PR 2000 RGT Electrical control with spool valve flow divider 45 l min Ref tarif 8664 8958 902 110 1 A PR 2000 R direct tractor Ref tarif 85...

Reviews: