Replacement
1
Before fitting the roller, fill with oil (see
Fluids and
Lubricants
, Section 3). Install the plug using an
appropriate pipe thread sealant.
With the undercarriage lifted and supported with
wooden blocks, position the roller on the track link as
shown.
Align the holes in the mounting brackets with the
tapped holes in the undercarriage.
2
Lower the undercarriage sufficient to allow the
mounting bolts to be installed.
3
Apply Loctite 262 to the threads and install the
mounting bolts. Tighten to a torque of 267 - 312 Nm (197
- 230 lbf ft, 27 - 31 kgf m).
4
Apply grease through the check valve to adjust the
track tension (see
Checking/Adjusting the Track
Tension
, Section 3).
Section J
Track and Running Gear
9803/6410
Section J
12 - 2
Issue 1
Bottom Roller
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...