![jcb JS130 Service Manual Download Page 518](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745518.webp)
9 - 2
Replacement
1
Before fitting the roller, check the oil level and, if
necessary, top up (see
Fluids and Lubricants
, Section
3). Install the plug using an appropriate pipe thread
sealant.
2
With the track supported as shown under
Removal
,
step 2, install the roller. Apply Loctite 262 to the threads
and fit the mounting bolts.
3
Remove the wooden blocks and jack.
4
Apply grease through the check valve to adjust the
track tension (see
Checking/Adjusting the Track
Tension
, Section 3).
Section J
Track and Running Gear
9803/6410
Section J
9 - 2
Issue 1
Top Roller
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...