![jcb JS130 Service Manual Download Page 513](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745513.webp)
6 - 1
Dismantling
1
Carry out steps 1 to 3 of
Idler Wheel and Recoil Unit
,
Removal.
Remove the lower roller immediately below the grease
cylinder (see
Bottom Roller
,
Removal
).
2
Remove bolts
A
and washers
B
and remove grease
cylinder
C
through the bottom of side frame
D
.
Assembly
Assembly is the reverse of dismantling.
When Assembling
1
Before installing grease cylinder
C
, remove check valve
E
and use a press (as shown) to fully retract the cylinder
and expel the grease. Refit the check valve.
2
Apply Loctite 262 to the threads of mounting bolts
A
.
3
When installing the grease cylinder, make sure it is
orientated so that check valve
E
is facing outwards to
the side of the machine.
4
Tighten bolts
A
to a torque of 267 - 312 Nm (197 -
230 lbf ft, 27 - 31 kgf m).
Section J
Track and Running Gear
9803/6410
Section J
6 - 1
Issue 1
Grease Cylinder
JS01520
JS01530
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...