background image

Installation Instructions 

JATCO Environmental Protection Tank 

J-5000cx

 100 

ABV

 

*INSTRUMENTATION GAS IS MANDATORY FOR SUPPLY GAS*

The JATCO Environmental Tank must be installed at a level which will allow the waste 
liquids to be disposed of to gravity flow into the tank. 

IMPORTANT: The top of the tank must be below the level of waste liquids to be 
received. 

Inlet and the outlet check valves are both teed from the same port near the bottom of the 
tank (end opposite the sight glass). When facing this end, the inlet check valve is on the 
left (

A) 

and the outlet check valve

 

is on the right 

(B)

The discharge should be piped directly to the storage tank that is to receive the waste liquid. 
The discharge may be teed into an existing flow line, provided that a high-pressure check 
valve (1000 psi)

 

is installed to prevent high pressure from returning to the discharge check 

valve on the JATCO tank. 

The tank supply gas must have adequate 

volume

 

and pressure. For best operation use 1” 

pipe for the tank supply gas plumed as close to the tank as possible. Then reduce down to the 
tubing connections 

(C) 

and

 (

J

on the JATCO tank. 

 

 

This application requires two separate supply gas pressures. First  supply gas pressure is 
connected to the bottom inlet of the micro valve 

(

C

this gas pressure must meet 

7

0 psi 

and not exceed 100 psi. Second supply gas pressure is connected to the 3-way ball valve 

(

J

)

this  gas pressure must not exceed 

1

00 psi for normal operation. No pressure

 

regulator

is provided.

Manual dump plunger 

(F)

 

and gauge cock knobs are removed for shipping. 

Manual Dump Plunger

 

(F)

: Install in ⅛” NPT hole in top of valve body

Note: The gland nut should be finger tight only. 

Depressing the manual dump plunger 

(F) 

allows the operator to check function of the float 

and micro valve. When the plunger is depressed, the tank will cycle once and return to the 
automatic operation. The plunger button should be returned to the extended position. 

3-way ball valve 

(G)

 is vented thru ½” NPT port 

(H)

.

Liquid levels in the JATCO tank may be observed in the sight glass

 

(I)

 furnished as standard 

equipment. 

244 N.W. 111

th

 St.     •       Oklahoma City, Oklahoma 73114    •      405/755-4100   •    405/755-4101 Fax 

Reviews: