background image

1

de

 

BETRIEBSANLEITUNG

OPERATING INSTRUCTION

 

NOTICE D’UTILISATION

en

 

fr

 

MEHRZWECKKESSEL & PASTEURISATOR FJ 50 E

PASTEURIZER, CHEESE AND YOGHURT KETTLE FJ 50 E

CHAUDIÈRE POLYVALENTE & PASTEURISATEUR FJ 50 E

JANSCHITZ GmbH 

|

 

Eisenstraße 81 | A-9330 Althofen

T: +43 4262-2251-0 | F: +43 4262-2251-13 

E: [email protected]

www.janschitz-gmbh.at

230 V - Type 13360

115 V - Type 13360-115

Summary of Contents for Milky 13360

Page 1: ...SEL PASTEURISATOR FJ 50 E PASTEURIZER CHEESE AND YOGHURT KETTLE FJ 50 E CHAUDI RE POLYVALENTE PASTEURISATEUR FJ 50 E JANSCHITZ GmbH Eisenstra e 81 A 9330 Althofen T 43 4262 2251 0 F 43 4262 2251 13 E...

Page 2: ...it Heizprozess K hlprozess Instandhaltung und Fehlerbehebung Reinigung Ersatzteilbestellung Garantie Seite 3 4 4 5 6 8 8 9 9 10 10 11 11 12 12 Lieber K ufer Wir sind berzeugt dass Sie mit unserem Mehr...

Page 3: ...ON DER STECK DOSE UND RUFEN SIE DEN AUTORISIERTEN KUNDENDIENST SIE SIND NUR BERECHTIGT DIE PROZEDUREN ZU VOLLF HREN WELCHE IN DIE SER GEBRAUCHSANWEISUNG BESCHRIEBEN SIND SOLLTEN SIE ANDERE VOR G NGE O...

Page 4: ...rch die Wand AUSPACKEN AUFSTELLEN UND ERSTEINSTELLUNG Packen Sie das Ger t sorgf ltig aus und versichern Sie sich dass nichts in der Verpackung zur ckbleibt Stellen Sie das Ger t auf einem flachen und...

Page 5: ...ichen Wasser versorgung aus einem Tank oder aus einem K hlsystem verwenden F r die Verbindung verwenden Sie bitte den vorgesehenen Wasseranschluss mit einem Wasserschlauch Das Wasser muss langsam in d...

Page 6: ...ntenstehend aufgef hrt 1 Deckel f r Kessel 2 Doppelwandiger Kessel 3 Ventil f r Milchauslass 4 Ellbogen Milchauslass 5 Elektrisches Geh use 6 Netzkabel und Stecker 208 V Version kommt ohne Stecker 7 E...

Page 7: ...7 7 8 7 8 9 10...

Page 8: ...e den Heizprozess Wenn das Ger t an den Strom angeschlossen ist sehen sie folgendes Zeichen am LCD Display BEVOR SIE DEN HEIZPROZESS STARTEN STELLEN SIE SICHER DASS SIE DEN DOP PELWANDIGEN KESSEL MIT...

Page 9: ...ZWISCHEN DEN W NDEN DIE TEMPERATUR DER MILCH IST GERINGER UND MUSS EXTRA GEMESSEN WER DEN DIE MILCHTEMPERATUR H NGT VOM ZU PASTEURISIERENDEN MILCHVO LUMEN DER TEMPERATUR DES HEIZWASSER UND DER UMGEBU...

Page 10: ...t nun bis zur eingestellten Temperatur auf Nachdem die eingestellte Temperatur erreicht wurde geht der Prozess des Erhitzens in die Halte Phase ber Das Steuerelement piepst und das gelbe Licht schalte...

Page 11: ...haben bevor das Thermostat aktiviert wird REINIGUNG Bevor Sie die Reinigung beginnen stellen Sie sicher dass das Ger t ausgeschalten und von der Stromversorgung getrennt ist Stellen Sie sicher dass d...

Page 12: ...menten oder Teilen davon die sich innerhalb von 12 Monaten nach dem Datum der Lieferung durch unsere berpr fung als schadhaft heraus stellen Sch den oder Verletzungen die durch den unsachgem en Gebrau...

Page 13: ...13...

Page 14: ...ating procedure Cooling procedure Maintance and Troubleshooting Cleaning Spare parts ordering Procedure Warranty Page 15 16 16 17 18 20 20 21 21 22 22 23 23 24 24 Dear Customer We are happy that you h...

Page 15: ...LUG THE DEVICE FROM ELECTRICAL SOCKET AND COMPRESSED AIR SOCKET THEN CALL AUTHORIZED SERVICE YOU ARE ALLOWED TO USE ONLY THE PROCEDURES THAT ARE DESCRIBED IN THIS MANUAL USE OF ANY OTHER PROCEDURES OR...

Page 16: ...oling and it freely flows through double layer when cooling is applied UNPACKING AND SET UP Unpack the device carefully and check that nothing is left in the cardboard box Place it on the plain and st...

Page 17: ...e sure that double layer of pasteurizer is filled with water You can use water from network tank or cooling system For connection use prepared tube Water must be poured in slowly not more than 3 litre...

Page 18: ...cribed below 1 Cover for milk pot 2 Double layer milk pot 3 Valve for milk outlet 4 Elbow milk outlet 5 Electric closet 6 Power cord and socket 208V edition comes without a socket 7 Inlet hose 8 Outle...

Page 19: ...19 7 8 7 8 9 10...

Page 20: ...button Starts or stops the heating process When device is energized you can read sign BEFORE STARTING THE HEATING PROCESS MAKE SURE THERE IS SECONDARY WA TER IN THE PASTEURIZATOR AND THAT SETTINGS ARE...

Page 21: ...MILK IS LOWER AND MUST BE MEASURED SEPARATELY MILK TEMPERATURE DEPENDS ON MILK VOLUME TO BE PASTEURIZED TEMPE RATURE OF HEATING WATER AND ENVIRONMENT TEMPERATURE TIME SETTINGS HOLDING TIME When red b...

Page 22: ...start the heating process The red light is on The display shows the present temperature and begins to heat till set temperature is reached After set temperature is reached heating transforms to holdin...

Page 23: ...se Make sure you disconnect the device from power supply before deacti vating the thermostat CLEANING Before cleaning make sure that the pasteurizer is switched off and disconnected from main power su...

Page 24: ...y is limited to the repair or replacement of the instrument or part thereof which shall within 12 months after date of shipment prove to be defective after our examination Defects or damages of the de...

Page 25: ...25...

Page 26: ...et parents Merci pour votre confiance fr SOMMAIRE Recommandations g n rales de s curit Donn es techniques D ballage Mise en service et premier r glage Outils accessoires et pi ces de rechange Montage...

Page 27: ...PRISE ET APPELEZ UN TECHNICIEN AUTORIS VOUS N TES AUTORIS EX CUTER QUE LES PROC DURES D CRITES DANS CE MANUEL SI VOUS EFFECTUEZ D AUTRES OP RATIONS OU R GLAGES ILS PEU VENT ENTRA NER LA DESTRUCTION D...

Page 28: ...a chaudi re est refroidie l eau circule librement travers le mur D BALLAGE MISE EN SERVICE ET PREMIER R GLAGE D ballez soigneusement l appareil et assurez vous qu il ne reste rien dans l emballage Pla...

Page 29: ...iser de l eau provenant de l alimenta tion en eau publique d un r servoir ou d un syst me de refroidissement Pour le raccor dement veuillez utiliser le raccord d eau fourni avec un tuyau d eau L eau d...

Page 30: ...Couvercle pour chaudi re 2 Chaudi re double paroi 3 Soupape pour la sortie du lait 4 Coude de sortie du lait 5 Bo tier lectrique 6 C ble d alimentation et fiche la version 208 V est livr e sans fiche...

Page 31: ...31 7 8 7 8 9 10...

Page 32: ...essus de chauffage Lorsque l appareil est connect l alimentation le symbole suivant s affiche sur l cran LCD AVANT DE COMMENCER LE PROCESSUS DE CHAUFFAGE ASSUREZ VOUS QUE VOUS AVEZ REMPLI LA CHAUDI RE...

Page 33: ...TURE DU LAIT EST PLUS BASSE ET DOIT TRE MESUR E S PAR MENT LA TEMP RATURE DU LAIT D PEND DU VOLUME DE LAIT PASTEURISER DE LA TEMP RATURE DE L EAU DE CHAUFFAGE ET DE L ENVIRONNEMENT R GLAGE DE LA DUR E...

Page 34: ...s de la chaudi re polyvalente pasteurisateur Raccordez la source d eau au tuyau d entr e et remplissez la double paroi avec l eau secondaire Raccordez le tuyau de sortie l appareil Remplissez le produ...

Page 35: ...tat NETTOYAGE Avant de commencer le nettoyage assurez vous que l appareil est teint et d branch de l alimentation lectrique Assurez vous que la chaudi re polyvalente pasteurisateur sont refroidis AVAN...

Page 36: ...osants et pi ces d fectueuses Notre garantie se limite au remplacement ou la r paration des instruments ou de leurs pi ces qui se sont av r s d fectueux lors de notre inspection dans les 12 mois suiva...

Page 37: ...37...

Page 38: ...38...

Page 39: ...39...

Page 40: ...40 Janschitz GmbH Eisenstrasse 81 9330 Althofen AUSTRIA Tel 43 4262 2251 0 Fax 43 4262 2251 13 Email office janschitz gmbh at www janschitz gmbh at...

Reviews: