JD-N2
INSTALLATION
JD-N2
Section B-13
Powering Up Procedure
Once the JD-N2 is properly mounted on the wall and all modules and sensors
connected to the terminal block, perform the following step:
Verify all Connections
Seal all cable entry holes.
Hermetically Close the JD-N2
Close the front panel and the lower access cover.
Put the power on
Secure the front panel with a lock
Summary of Contents for JD-N2
Page 3: ...JD N2 WIRING DIAGRAM JD N2 Section A 3 WIRING DIAGRAM JD N2 SECTION A ...
Page 6: ...JD N2 INSTALLATION JD N2 Section B 6 INSTALLATION JD N2 SECTION B ...
Page 19: ...JD N2 USER S GUIDE JD N2 Section C 19 USER S GUIDE JD N2 SECTION C ...
Page 20: ...JD N2 USER S GUIDE JD N2 Section C 20 Control Description 7 3 3 5 1 2 3 4 6 ...
Page 28: ...JD N2 INDEX WARRANTY JD N2 Section D 28 INDEX WARRANTY JD N2 SECTION D ...