
J-200
GRN
WHT
WHT
BLK
BLK
BLK
RED
1
2
3
Figure-C
TB1
to Circuit
Board
Power In
GRN
WHT
WHT
BLK
BLK
BLK
RED
RED
RED
1
2
3
Figure-D
TB1
to Circuit
Board
Power In
Move Red
Wire Here
North American Convertible
Models:
120 VAC, 3-Wire Connection
60 Hz
North American Convertible
Models:
240 VAC, 4-Wire Connection
60 Hz
CAUTION (For 4-wire 240 VAC Heater Operation): Move the red
wire on the main terminal strip (TB1) from position #1 to position
#3. Make certain wires are connected exactly as shown in Figure
D before applying power. Failure to do so will result in damage
to the circuit board and/or related components and void the
manufacturer’s warranty.
BLK
RED
RED
RED
BLK
BLK
1
2
Figure-E
TB1
to Circuit
Board
Power In
Green
TB3
BLUE
BLUE
BROWN
BROWN
Figure-F
TB1
to Circuit
Board
Power In
Green
TB3
1
2
TB1
1
2
TB2
North American 240V Models:
240 VAC, 3-Wire Connection 60 Hz
All Export Models:
230 VAC, 3-Wire
Connection 50 Hz
Congratulations!
You are now all set to get your new spa ready to use.
Simply follow the step-by-step procedure in Section 8.0, before long,
you will be enjoying your first glorious experience in your Jacuzzi J-200
Collection spa.
Figure B
Control Box
TB1
3
2
1
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
16