EMPTYING THE CNG SYSTEM
13
–
Printed 692.68.697
–
5 Ed. - Base 03/2019
269946
Figure 6
A.
Truck C8 or C9 NP 400 / C13 NP460
B.
Articulated truck C8 or C9 NP 400
1.
NVG1 valve
2.
NVG2 valve
3.
Safety solenoid valve on cylinder
4.
Ventilation valve
5.
Shut-off valve (if present)
6.
Pressure gauge
a) Partial emptying
This operation only guarantees ventilation of the system downstream of the gas cylinders.
●
Prepare a rubber hose which is compatible with the gas and is of a suitable diameter for coupling with the filler on the ventila-
tion valve (4, Figure 6).
●
Leave one end of the rubber hose at least 5 m from the cylinders and from any possible sources of flame; position the other
end close to the ventilation valve.
●
Cut off power supply by turning off the main current contactor.
●
Disconnect the battery cables and electrically ground the vehicle.
●
Check that the cocks of the solenoid valves on all the cylinders are closed.
●
Correctly position the hose (compatible with the gas) on the ventilation valve filler (4, Figure 6) leaving the other end of the
pipe at a distance of at least 5 metres from the cylinders and from any possible sources of flame.
●
Slowly open the ventilation valve (4, Figure 6) to prevent the sudden decompression of the gas and the corresponding effects
(freezing).
●
After a few minutes, check that the pressure in the system is null.
Summary of Contents for Stralis MY 2016
Page 1: ...I S S U E 0 3 2 0 1 9...
Page 3: ...Printed 692 68 697 5 Ed Base 03 2019 UPDATE DATA Section Chapter Description Revision date...
Page 6: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 7: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 1 GENERAL INFORMATION...
Page 8: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 27: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 2 CHASSIS INTERVENTIONS...
Page 28: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 87: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 139: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 4 POWER TAKE OFFS...
Page 140: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 165: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 166: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 225: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 226: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 235: ...Printed 692 68 697 5 Ed Base 03 2019 APPENDIX A STRALIS NP CURSOR CNG LNG...