12
NEW STRALIS MY2016
‒
GUIDELINES FOR BODYBUILDERS
STRALIS NP - CURSOR CNG-LNG
A.5
EMPTYING THE CNG SYSTEM
–
Printed 692.68.697
–
5 Ed. - Base 03/2019
▶
The breather valves are essential for the safe operation of the system and therefore must always
be accessible. Please read the Use and Maintenance Manual carefully for all indications in this
regard.
d) ATS system (After Treatment System)
The insulators and the heat shields must remain in their original position. Any modification must receive prior authorisation from
IVECO.
e)
Gas pipes
Any modification of the pipes must be compliant with Standard ECE R110 and all the components must be type-approved accord-
ing to ECE R110.
Lengthening the pipes may have a negative impact on performance due to reduced injection pressure (especially for the LNG ver-
sion).
Do not reposition components of the gas system such as the regulator, sensor or filter without having received explicit authorisa-
tion and approval from IVECO.
▶
It is strictly prohibited to modify the diameter of the gas pipes.
A.5
EMPTYING THE CNG SYSTEM
Note
Contact the IVECO Service Network before carrying out any intervention.
▶
Before any welding operations on the vehicle or maintenance operations on the engine, the fuel
system must be fully "ventilated", i.e., it must be emptied of gas.
It is usually sufficient to partially empty the circuit, namely, empty only the pipes; however, to operate in conditions of greater safety,
it is recommended that the entire system is emptied, including the cylinders.
▶
The emptying operations must be carried out while the engine is OFF and in an environment
with suitable air exchange (a forced air exchange is preferable).
▶
To limit the release of uncombusted gas as much as possible, keep the engine running until the
pressure of the gas drops to the minimum value of 20 bar.
Note
Consumption of the gas at a residual pressure of 20 bar is a procedure which is less harmful to the environment than releasing the
gas directly into the atmosphere.
Summary of Contents for Stralis MY 2016
Page 1: ...I S S U E 0 3 2 0 1 9...
Page 3: ...Printed 692 68 697 5 Ed Base 03 2019 UPDATE DATA Section Chapter Description Revision date...
Page 6: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 7: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 1 GENERAL INFORMATION...
Page 8: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 27: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 2 CHASSIS INTERVENTIONS...
Page 28: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 87: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 139: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 4 POWER TAKE OFFS...
Page 140: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 165: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 166: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 225: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 226: ...Printed 692 68 697 5 Ed Base 03 2019...
Page 235: ...Printed 692 68 697 5 Ed Base 03 2019 APPENDIX A STRALIS NP CURSOR CNG LNG...