NEW DAILY
–
CHASSIS INTERVENTIONS
CHASSIS INTERVENTIONS
2.13
WORK ON SHEET METAL
43
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Work on the structure and floor
Over and above the indications and precautions already mentioned, also bear in mind that:
●
when drilling holes in the box sections, avoid areas where stresses are more concentrated (especially uprights A and B);
●
The holes used for anchorage to the floor must be protected and sealed against infiltration of water, dust and exhaust gas;
●
any lowering of the rear wheel arches must bear in mind possible juddering of the suspension and the possibility that snow
chains may also be present. In this regard, Figure 27 highlights the cases that may arise and the related maximum possible
lowering measurements.
173263
Figure 27
A.
Van with windows/Vendor 3.5 t
B.
Minibus-Vendor/Van with windows 4.2-4.5-5 t
C.
Van 6.5-7 t
1.
Standard wheel arch profile, van version
a.
Maximum possible lowering
Table 2.16
Maximum permitted overall weight [t]
Tyres
Measurements [mm]
3,5 (side member of straight chassis)
225 / 65 R16
235 / 65 R16
195
210
4.2 - 4.5 - 5 (side member of straight chassis)
195 / 75 R16
165
6.5 - 7 (side member of straight chassis)
225 / 75 R16
165
Note
For work on the bodywork of vehicles equipped with front suspension with torsion bar, it is vital to ensure access to the trim adjust-
ment system.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...