16
NEW DAILY
–
GENERAL INFORMATION
GENERAL INFORMATION
1.17
GENERAL REGULATION FOR THE PREVENTION OF FIRE RISK
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
●
adequate ventilation must be maintained for the brakes and battery casing (particularly in the execution of truck bodies);
●
in the placement of fenders and wheel arches, free shaking of the rear wheels must be guaranteed, even under the conditions
of use with chains.
●
adjustment of the vehicle's headlamps must be checked once construction is completed, to correct any changes in their struc-
ture; for adjustment, proceed according to the instructions given in the "Use and Maintenance Handbook";
●
for any elements supplied loose (e.g. spare wheel, chocks), the Body builder must position and fasten them in an accessible and
secure way, in compliance to any national regulations.
1.17
GENERAL REGULATION FOR THE PREVENTION OF FIRE RISK
Particular attention must be paid to prevent the spillage of hydraulic fluids or inflammable liquids above components which may
become hot or overheated.
Therefore, when pipes must be inevitably installed near the engine, exhaust system, catalytic converter or turbocharger, suitable
insulating shields or protective plates must be provided.
1.18
CONVENTIONS
91473
Figure 6
In these Guidelines the following conventions are adopted:
●
Wheelbase:
distance between the centre lines of the first
steering axle and the first rear axle (engine or not).
●
Rear overhang:
distance between the centre line of the last
axle and the rear extremity of the chassis side members.
●
Dimensions A, B and t
of the chassis section: see the picture
on the side.
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...