20
NEW DAILY
–
DAILY CNG AND CNG WITH "RECOVERY MODE"
DAILY CNG AND CNG WITH "RECOVERY MODE"
B.4
CYLINDERS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
B.4
CYLINDERS
117674
Figure 19
1.
Cylinder
2.
Solenoid valve
The CNG, compressed at a pressure of 200 bar, is stored in some cylinders, positioned in the chassis frame and protected by spe-
cial sheet metal guards.
The cylinders, connected together in series, are filled via a filling valve equipped with a check valve.
A second check valve is included in the solenoid valve fitted on the first cylinder connected to the filling union. The function of the
check valves is to prevent the gas escaping outwards and the dispenser being removed from the filling valve after refilling.
Note
The presence of a malfunctioning flow valve or solenoid valve can lead to incorrect readings of the amount of gas in the cylinders.
Please refer to the procedures for checking and replacing solenoid valves described, in the paragraph "VBE solenoid valve replace-
ment (
Page 16)".
The top surface of the cylinder is punched (
→
) with important information to which particular care should be taken.
208220
Figure 20
1.
Month of expiry (previous to that tested)
2.
Year of expiry (after 20 years)
3.
Nominal capacity
4.
Cylinder weight
5.
Operating pressure, MPa
6.
Testing pressure, MPa
7.
Punch identifying country of type-approval
8.
ECE/ECE type-approval number
9.
Month/year of test
10.
Inspector's punch
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...