16
NEW DAILY
–
ELECTRONIC SUB-SYSTEMS
ELECTRONIC SUB-SYSTEMS
5.4
ELECTRICAL SYSTEM: CURRENT INTERVENTIONS AND DRAWS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Ground points
In general, original vehicle ground connections are not to be modified; in cases where these connections must be moved or new
connections added, use the holes present on the chassis to the extent possible, taking care to:
●
mechanically remove - either by filing and/or with a suitable chemical based solution - the paint on both the chassis and ter-
minal side, thus creating a contact surface free of indentations and edges;
●
paint the area between the terminal and metal surface with a suitable high conductivity paint
●
connect to earth within 5 minutes after application of the paint.
As regards the signal related ground connections (e.g. sensors or low-absorption devices), do not use the standardized points Un-
der no circumstances use standardized points for engine ground connection and chassis ground connection.
Additional signal grounds must be positioned at different points from the power ground.
191316
Figure 9
1.
Ground connections: (A) connection is correct; (B) connec-
tion is incorrect
2.
Correct cable fastening to the ground point using: (A)
screw, (B) cable terminal, (C) washer, (D) nut
3.
Cable connected to ground
208939
Figure 10
Position of ground points on vehicle
m1.
Ground on crankcase
m2.
Engine compartment ground on left chassis side mem-
ber
m3/ms3.
Engine compartment ground under servobrake
m4.
Engine compartment ground near front right headlight
m5.
Engine compartment ground near front left headlight
m6/ms6.
Cab interior ground, central section
m7.
Cab interior ground, central section
m8.
Cab interior ground, front right section
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...