NEW DAILY
–
POWER TAKE-OFFS
POWER TAKE-OFFS
4.5
PTO MANAGEMENT
9
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
●
the power take-off must be located immediately downstream of the gearbox; for vehicles with the drive line in two or more
sections, the power take-off may also be fitted at the flexible support between the first and second sections (respect the in-
dications given in Chapter 2.8 (
Page 26));
●
the angles of the drive line on the horizontal plane and vertical plane must be kept as close as possible to the original values;
●
masses and rigidity added to the drive line must not provoke a loss of balance or abnormal vibrations or damage the transmis-
sion drive line (from engine to axle) either during vehicle movement or during operation with the power take-off;
●
the power take-off must be fixed to the chassis with its own suspension.
▶
The transmission is an important part for the safety of the vehicle, and as such any intervention
on the transmission must only be carried out by specialist companies approved by the manufac-
turer.
Note
Any intervention on the driveshaft carried out without prior authorisation from IVECO will immediately invalidate the warranty.
4.5
PTO MANAGEMENT
Note
At the time of publication of these Directives, the information in this Chapter may have been subject to changes. It is therefore
recommended that any possible modifications are verified by consulting
www.ibb.iveco.com
.
General information
For first equipment the vehicle can be alternatively equipped with:
a) PTO pre-installation
(Opt. 77910 on gearbox 2840.6 and 2850.6 and Opt. 75977 for gearbox 2835.6);
PTO pre-installation consists of:
●
cover on gearbox (see Figure 3);
●
bonnet cable (see Figure 5).
Refer to the following paragraph for PTO installation (point 1)
Note
There is always a cover on the gearbox on gearboxes 2840.6 and 2850.6 (see Figure 3), while the cover is only present with option
75977 on gearbox 2835.6).
b) PTO pre-installation
(Opt. 77910 on gearbox 2840.6 and 2850.6 and Opt. 75977 for gearbox 2835.6)
and Expansion
Module
(opt. 8657)
PTO pre-installation consists of:
●
cover on gearbox (see Figure 3);
●
bonnet cable (see Figure 5).
The Expansion Module is an electronic interface designed to manage certain types of configurations (additional lights, alarms, "after
market" PTOs, etc.) and is pre-installed on the vehicle.
Refer to the following paragraph for PTO installation (point 2)
Note
There is always a cover on the gearbox on gearboxes 2840.6 and 2850.6 (see Figure 3), while the cover is only present with option
75977 on gearbox 2835.6).
c) PTO
(Opt. 75076/75077/75078)
and Expansion Module
(opt. 8657)
Summary of Contents for NEW DAILY
Page 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Page 4: ...Printed 603 95 789 Base 02 2014...
Page 6: ...Printed 603 95 789 Base 02 2014...
Page 8: ...Printed 603 95 789 Base 02 2014...
Page 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Page 10: ...Printed 603 95 789 Base 02 2014...
Page 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Page 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 603 95 789 Base 02 2014...
Page 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Page 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 88: ...Printed 603 95 789 Base 02 2014...
Page 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Page 122: ...Printed 603 95 789 Base 02 2014...
Page 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Page 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 138: ...Printed 603 95 789 Base 02 2014...
Page 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Page 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 190: ...Printed 603 95 789 Base 02 2014...
Page 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Page 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Page 202: ...Printed 603 95 789 Base 02 2014...
Page 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Page 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Page 218: ...Printed 603 95 789 Base 02 2014...
Page 240: ...Printed 603 95 789 Base 02 2014...