4.3 Position for assembling

The delivery position 
is position A

The terminal box must not
point downwards (M, N, O, P),
as otherwise water may 
penetrate easily.
Before installing the pump,
the terminal box can be 
turned by 90° in each case. 
To do this, undo the casing’s 
4 screws and turn the motor
head to the required terminal
box position. 
Do not shift or damage the 
seal between the motor and
pump casing. After inserting
the screws, tighten them up
diagonally.

4.4 Installation

Installation only after 
completion of all welding 
and soldering work.
Be sure to avoid any water
dripping onto the pump 
motor and especially 
the terminal box.
The shaft must always 
be

horizontal,

never vertical.

Install the pump casing 
stressfree in the system.

4.5 Direction of flow

The arrow on the pump
casing indicates the direction
of flow.

4.6 Return valve

If a return valve has been
installed, the pump has to be
set up (see point 6.4) 
so that the pump’s minimum
delivery pressure can exceed
the valve’s closing pressure 
at any time.

Security measures must be taken to see that persons
do not inadvertently come into contact with the hot
surface areas of the pump.

LXE_HXE  03.11.2006  8:36 Uhr  Seite 37

Summary of Contents for HXE Series

Page 1: ...nd Betriebsanleitung Instructions d installationet d entretien Installation and Operating Instructions Heizungsumw lzpumpen Circulateurs de chauffage Heating circulators Baureihe Series Model LXE LXED...

Page 2: ...Stockerau Ernst Vogel Stra e 2 Produits Pompes de la s rie LXE HXE LXED HXED Les produits nonc s sont conformes aux r glementations de la directive machines CE 98 37 CE Fabriqu de Biral AG Suisse Norm...

Page 3: ...4 14 4 18 4 14 4 18 L1 190 250 250 270 270 220 220 220 220 L2 95 125 125 135 135 110 110 110 110 L3 255 T1 296 318 318 314 314 318 318 318 318 T2 48 61 61 65 65 61 61 61 61 T3 248 243 243 231 231 243...

Page 4: ...14 4 18 4 14 4 18 4 14 4 18 L1 250 250 270 270 250 250 L2 112 112 108 108 112 112 L3 144 144 124 124 144 144 T1 306 306 298 298 306 306 T2 73 73 77 77 73 73 T3 231 231 215 215 231 231 Abmessungen Typ...

Page 5: ...t Lagerung 8 3 Verwendungszweck 8 3 1 Betriebstemperatur Betriebsdruck 8 4 Montage 8 4 1 Durchsp len der Heizungsanlage 8 4 2 Frostschutzmittel 8 4 3 Montagepositionen 8 4 4 Einbau 9 4 5 Durchflussric...

Page 6: ...deren Abschnitten ein gef gten speziellen Sicherheitshinweise 1 2 Kennzeichnung von Hinweisen Dieses Symbol finden Sie bei Sicherheits hinweisen deren Nichtbeachtung Gefahren f r die Maschine und dere...

Page 7: ...qualifiziertem Fachpersonal ausgef hrt werden das sich durch eingehendes Studium der Montage und Betriebsanleitung aus reichend informiert hat Grunds tzlich sind arbeiten an der Anlage nur im Stillst...

Page 8: ...F rderdaten der Pumpen entsprechend korrigieren 3 Verwendungszweck Die Umw lzpumpen der Typenreihe LXE HXE Einzelpumpe LXED HXED Zwillingspumpe werden zur F rderung von Fl ssigkeiten in Warmwasser Hei...

Page 9: ...Abschluss aller Schweiss und L tarbeiten an der Anlage Tropfwasser auf den Pumpen motor speziell Klemmenkasten unbedingt vermeiden Die Welle muss immer waagrecht sein nie senkrecht Das Pumpengeh use...

Page 10: ...i einem m glichen Austausch der Pumpe ein Ablassen und Wiederauff llen der Anlage erspart 4 7 Flanschanschluss Die Pumpenflansche sind mit Befestigungsl cher PN6 PN10 PN16 gebohrt F r eine sichere Ver...

Page 11: ...otorgeh use nicht ber hren Tropfwasserschutz und Zugentlastung bei Kabeleinf hrung in Anschlusskasten Stopfbuchse beachten Vorsicherung max 10 A tr ge Drahtquerschnitt max 2 5 mm2 Anlaufstrom Nennstro...

Page 12: ...Die Pumpe kann auf eine Minimaldrehzahl min eingestellt werden Siehe Anschlussschema Klemmen 10 13 extern min 1 min 2 Leistungsbegrenzung Anschlussschema 10 11 Steuerkontakt f r externe Ein und Aussch...

Page 13: ...bgeschaltet sein 71 72 Analogeingang 0 10 V oder 0 20 mA f r externe Vorgabe der Drehzahl Bemerkungen Wenn das Analogmodul gesteckt ist hat der Dreh knopf am Klemmenkasten Druckeinstellung keine Funkt...

Page 14: ...lls jedoch eine sehr rasche Entl ftung gew nscht wird wie folgt vorgehen Pumpe ausschalten Systemdruck auf 0 5 bar reduzieren Verschlussschraube so weit l sen zirka eine Umdrehung gegen Uhrzeigersinn...

Page 15: ...hen Beginnend mit kleinster F rderh he z B 1 1 m Werden die entferntesten Heizk rper nicht warm die F rderh he stufenweise zu gr eren Werten 3 4 verstellen 6 4 Deblockieren Pumpe ausschalten Absperror...

Page 16: ...e l uft im Bereich B blinkt gr n ein aus unregelm ssig Pumpe l uft im Bereich C blinkt gr n ein aus regelm ssig St rung Elektronik blinkt rot aus1 ein1 regelm ssig Nachtabsenkung blinkt gr n rot ein a...

Page 17: ...Systemdruck erh hen Temperatur vermindern Pumpe zu stark kleinere elektrische Stufe kleinere Pumpe Leistungseinstellung Leistungseinstellung der Pumpe berpr fen Heizk rper werden nicht warm Pumpe zu...

Page 18: ...LXE_HXE 03 11 2006 8 36 Uhr Seite 18...

Page 19: ...ansport et stockage 22 3 But d utilisation 22 3 1 Temp rature et pression de service 22 4 Montage 22 4 1 Rin age de l installation de chauffage 22 4 2 Produit antigel 22 4 3 Position de montage 23 4 4...

Page 20: ...Qualification et formation du personnel Les personnes charg es d installer de faire fonctionner d entre tenir et de r viser l installation doivent justifier de la quali fication requise pour ces diff...

Page 21: ...ifi et autoris et ayant lu attentivement les instructions donn es dans la pr sente notice D une mani re g n rale les interventions sur l installation ne doivent tre effectu es qu apr s avoir mis la di...

Page 22: ...corrosion M lange eau glycol autoris seulement jusqu 50 de glycol A partir de 10 de glycol corriger en cons quence les caract ristiques de refoulement des circulateurs 3 But d utilisation Les circulat...

Page 23: ...re les vis et les visser en diagonale 4 4 Pose Effectuer la pose seulement lorsque tous les travaux de soudage de brasage sur l installation sont termin s Eviter absolument que de l eau goutte sur le...

Page 24: ...une vanne d arr t en amont de la pompe et une autre en aval Cela permet si la pompe doit un jour tre remplac e d viter de devoir purger et remplir de nouveau l installation 4 7 Raccord bride Les bride...

Page 25: ...5 max 10 A action retard e Section des fils max 2 5 mm2 Courant de d marrage courant nominal Le raccordement lectrique doit tre effectu conform ment la plaque indiquant les caract ristiques Afin de fa...

Page 26: ...fich r gime minimal 1 min 1 Etat de livraison J1 non enfich r gime minimal 2 min 2 min 1 min 2 puissance max Sch ma de raccordement 10 11 Contact de commande pour enclenchement et d clenchement extern...

Page 27: ...e couvercle de la bo te bornes et de d monter le circulateur toujours couper int gralement tous les p les l alimentation lectrique Remarques Si le module analogique est branch le bouton rotatif sur la...

Page 28: ...e en marche alimentation lectrique 6 3 R glage de la puissance R gler la hauteur de refoulement l aide du s lecteur rotatif plac sur le coffret bornes du circulateur r gulation en continu p ex de 1 ma...

Page 29: ...cer avec la hauteur de refoulement p ex 1 1m Si les radiateurs les plus loign s ne chauffent pas augmenter progressivement 3 4 la hauteur de refoulement 6 4 D blocage Mettre le circulateur l arr t Fer...

Page 30: ...ue rouge clignotant arr t marche r guli re Marche au ralentie nuit voyant rouge rouge marche arr t Le circulateur est bloqu rouge continu arr t 1 marche1 clignotement r gulier allum 1 s teint 1 s clig...

Page 31: ...un circulateur plus petit mauvais r glage v rifier le r glage de la puissance de la puissance du circulateur Les radiateurs ne chauffent pas circulateur pas assez puissant installer un circulateur pl...

Page 32: ...LXE_HXE 03 11 2006 8 36 Uhr Seite 32...

Page 33: ...e 36 3 Intended application 36 3 1 Operating temperature Operating pressure 36 4 Assembly 36 4 1 Flushing the heating system out 36 4 2 Antifreezers 36 4 3 Position for assembling 37 4 4 Installation...

Page 34: ...training The staff deployed for assembly operating maintenance and inspection tasks must show that they have the appropriate qua lifications for such work The field of responsibility competence and su...

Page 35: ...e informed themselves adequately about the requirements by a thorough study of the installation and operating instructions Basically any works on the plant should only be carried out when it is at a s...

Page 36: ...h bronze housings should be used in industrial water installations if the water hardness is below 20 tH 14 dH A dry running meter should be used in the case of greater water hardness 3 1 Operating tem...

Page 37: ...ion only after completion of all welding and soldering work Be sure to avoid any water dripping onto the pump motor and especially the terminal box The shaft must always be horizontal never vertical I...

Page 38: ...slide valve before and after the pump This will avoid having to drain and refill the system if the pump has to be replaced 4 7 Flange connection The pump flanges are bored with fixing holes PN6 PN10 P...

Page 39: ...ross section 1 5 mm2 Starting current rated current The electrical connection must be made in accordance with the data plate To simplify later replacement the electrical connection should be looped It...

Page 40: ...the current before changing over the plugs Switch current on If possible the power and indicator cables must be run separately min 1 min 2 Power limiting Connecting diagram 10 11 Control contact to sw...

Page 41: ...erminals 71 72 the pump operates at minimum power no voltage corresponds to 0 volt Installation remove existing cover encapsulate supplementary module 71 72 insert plug into main PCB carefully fit cov...

Page 42: ...pe of liquid Switch the pump on and off 5 to 8 times until only water emerges at the screw plug Tighten screw plug Increase system pressure again Switch pump on 6 2 Deaerating Deaeration of the pump i...

Page 43: ...ary switch is set After approx 20 seconds the pump automatically adjusts to the set pressure and thus to the existing operating point P1 6 4 Deblocking Switch pump off Shut the stop valves before and...

Page 44: ...Pump OFF off off off Pump running in sector A lit green on off Pump running in sector B flashes green on off irregularly Pump running in sector C flashes green on off regularly Electronics fautes flas...

Page 45: ...temperature Pump too powerful smaller electric setting smaller pump Power setting Check power setting of pump Radiators do not warm up Pump too weak install more powerful pump Air in the pump deaerate...

Page 46: ...46 LXE_HXE 03 11 2006 8 36 Uhr Seite 46...

Page 47: ...Graz Seiersberg K rntner Stra e 518 Telefon 0316 28 61 20 Telefax 0316 28 70 42 A 9020 Klagenfurt Schachterlweg 58 Telefon 0463 31 93 20 Telefax 0463 31 93 17 A 4600 Wels Haidestra e 41 Telefon 07242...

Reviews: